Just below Larry the cat I suspect and fear.
That high? Boom times are coming!
Just below Larry the cat I suspect and fear.
A serious, serious upgrade of Derby - Stoke would help.
John Hayes is back in Transport though I do not know which brief he has
The Home Office was usually regarded as a short straw but Teresa May held it down for longer than usual and did well out of it.Is being appointed to the Transport Ministry still viewed by career politicians as "drawing the short straw"...:roll:
The Home Office was usually regarded as a short straw but Teresa May held it down for longer than usual and did well out of it.
I didn't think Transport was regarded as a particularly short straw but it is the sort of ministry that often gets involved in reshuffles as a result of problems that start in other ministries.
Transport is a Department where one is going up the political ladder or falling down it
Exactly so. Just not one of the far more attractive ministries to have to spend time in office.
That will sound like heresy to those on this website whose blinkered vision can only see the Transport ministry as the most important one in their eyes...![]()
Transport sorts the men from the boys.
I am sure that Justine Greening when in post in that ministry would have some personal thoughts on what you have said above.
Justine was a good SoS who published the crucial 2012 HLOS (ie CP5) with the big raft of electrification projects.
Justine was a good SoS who published the crucial 2012 HLOS (ie CP5) with the big raft of electrification projects.
OK, but does she fall in the "men" category or the "boys" category?
You mean the over-ambitious programme that has turned out to be unachievable?
His constituency (Epsom and Ewell) is firmly in Southern territory!
Sure the could push forward HS3 and reopen lines to Winchester, Wisbeach and Cambridge, but it would be years before a single bit of track was laid.
.
Transport sorts the men from the boys. There's a lot of Government departments where you can get away with being useless, Transport is absolutely not such a department.
Did Alistair Darling do anything useful when there? He went on to be Chancellor.
I suppose he succeeded in the brief Blair gave him, which reportedly was to keep transport out of the news.
Sure the could push forward HS3 and reopen lines to Winchester, Wisbeach and Cambridge, but it would be years before a single bit of track was laid.
The thing is even if they wanted to go on a spending binge, it would take years to happen.
Where are all the spare engineers? we are pushing the envelope now. For the future they are now building more training colleges etc for these things but it will be years before we see a boost in numbers and actual people with project management experience will be thin on the ground for years.
Sure the could push forward HS3 and reopen lines to Winchester, Wisbeach and Cambridge, but it would be years before a single bit of track was laid.
I suspect. small road schemes will get a boost and if you want economic stimulus that require less skills and can happen in months, then a mass house building programme would suit the bill.
You can get any half decent civil engineering contractor to do earthworks and drainage, as such if it were to be a new line away from the operating rail lines then you could start fairly soon and just bring in the specialist railway contractors to do the actual railway elements later when they have the capacity.
The program wasn't particularly overly ambitious at the time, we all thought the bulk of the electrification would be just about achievable, then it all started going wrong on the GWML almost as soon as we hit the ground.
What it has highlighted and this is something you see reflected in the Scottish Route Study, is that it's sensible to de-couple route clearance and gauge enhancement from electrification.
Electrification shouldn't be hitting signalling cables in the ground, it shouldn't be held up by protesters whinging about designs, it shouldn't be following and mingling with track lowering and drainage teams, it shouldn't be leaving wiring runs whilst bridge re-building continues.
Electrification on its own is actually very simple, quick and easy, Paisley Canal was 150 days from contract signing to energisation - total electrification was 8.8 single track kilometres. It's having to fit in and around other projects, provide access for other trades and stop every five minutes when signalling is lost that's the killer.
The good news really is that with every new footbridge, every rebuilt road bridge, every closed level crossing, every new signal and every new station canopy, we're slowly making electrification easier, quicker and cheaper.