• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Railway General Knowledge.

Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Spamcan81

Established Member
Joined
12 Sep 2011
Messages
1,264
Location
Bedfordshire
Indeed it is. Your turn to thumb the pages of a locoshed directory :D

Thanks. I recognised the Forde bit from the address of the former David & Charles publisher's address who were based in Newton Abbott.

Kyösti Kylälä developed an improved exhaust system for steam locomotive boilers. He patented it in the UK. On which class of locomotive was it trialled?
 

eastdyke

Established Member
Joined
25 Jan 2010
Messages
2,058
Location
East Midlands
No. Chapelon used Kylälä's ideas in developing the Kylchap but Kylälä's own system was trialled on a UK locomotive.
I don't swing by here very often so if you accept my answer I will leave an open floor ...

I believe that was the LB&SCR Billinton K class 2-6-0 experimentally fitted in 1922?
 

Spamcan81

Established Member
Joined
12 Sep 2011
Messages
1,264
Location
Bedfordshire
I don't swing by here very often so if you accept my answer I will leave an open floor ...

I believe that was the LB&SCR Billinton K class 2-6-0 experimentally fitted in 1922?

You are correct. The regulator is available to anyone who wishes to grab it.
 

D6130

Established Member
Joined
12 Jan 2021
Messages
9,004
Location
West Yorkshire/Tuscany
Which section of line (i.e. between which stations) was experimentally equipped with Scottish Region Tokenless Block signalling in the mid-1960s prior to its installation on the Highland Main Line in 1968-69?
 

AndyPJG

Member
Joined
29 Jun 2012
Messages
543
Ex-LSWR line from Wilton to Pinhoe was singled and converted to Tokenless Block around that time, not sure if it was the first installation though.
 

D6130

Established Member
Joined
12 Jan 2021
Messages
9,004
Location
West Yorkshire/Tuscany
Ex-LSWR line from Wilton to Pinhoe was singled and converted to Tokenless Block around that time, not sure if it was the first installation though.
I'm afraid not....that line was equipped with the Western Region version of Tokenless Block, which had/has block instruments in the station buildings where appropriate, to allow the signaller to undertake station and ticket issuing duties as well. I did specify "Scottish Region Tokenless Block".
Usan-Montrose?
Sorry....not that one either.
 

D6130

Established Member
Joined
12 Jan 2021
Messages
9,004
Location
West Yorkshire/Tuscany
It's all gone quiet for a couple of days. Do you want me to give the answer so that we can move on to another question -which will be open floor - or shall I wait for a couple of days? There aren't many sections of single line left!
 

D6130

Established Member
Joined
12 Jan 2021
Messages
9,004
Location
West Yorkshire/Tuscany
It's an ex North British Railway - and later LNER - section of line with four stations connected by three single line sections. The ScRTB installation was superceded in 1988 by RETB, having been in use since 1964. The system provided for the two intermediate stations to have a bi-directional main line and a unidirectional loop - which allowed the block posts concerned to be switched-out when not required for crossing trains, thus permitting considerable staff savings. That facility is no longer provided - or needed - under RETB.
 

Railsigns

Established Member
Joined
15 Feb 2010
Messages
2,754
The correct answer was given in post #11,781: The first, experimental installation of ScR tokenless block was between Usan and Montrose (South) on 12 December 1965.

The next was a portion of the West Highland Line between Crianlarich and Rannoch, in July/August 1967. There were three intermediate crossing loops with signal boxes that could switch out (Tyndrum Upper, Bridge of Orchy and Gorton). This tokenless block installation was superseded by electric token block (key tokens) in August 1985, almost three years before RETB was introduced.
 

D6130

Established Member
Joined
12 Jan 2021
Messages
9,004
Location
West Yorkshire/Tuscany
The correct answer was given in post #11,781: The first, experimental installation of ScR tokenless block was between Usan and Montrose (South) on 12 December 1965.

The next was a portion of the West Highland Line between Crianlarich and Rannoch, in July/August 1967. There were three intermediate crossing loops with signal boxes that could switch out (Tyndrum Upper, Bridge of Orchy and Gorton). This tokenless block installation was superseded by electric token block (key tokens) in August 1985, almost three years before RETB was introduced.
Oh well....looks like I got it wrong. Sorry folks! My answer was Crianlarich-Rannoch, but if @Railsigns is correct, then @Gloster - an ex-signaller, I believe, has 'Line Clear'.
 

Top