An interesting but ambiguous phrase was used by the L&YR in their standard specifications for would be contractors intending in bidding for contracts to build lines for that railway company in the 1870s...
After it explains that the straight rails (21 feet in length) must be laid exactly that, straight and free from twists and slight bends, it states the following (exact wording and punctuation):
"and in the curves must be bent and worked to the arc of the curve."
What does this mean exactly?
The contractor has to take straight rails and bend them?
The company will supply curved rails but you have to ensure the curve is the exact arc required?
And in any case, how on site would you bend the rails to the exact arc?
The drawings as mentioned for any line by the L&Y would always start with No. 1 Plan and No.2 Section. Now as a contractor you need to know what arc of a curve is required and where, so I presume one of these two drawings (perhaps numbered 2a, 2b etc) would have an exact track diagram of the new route?
It must have been far more time consuming to lay curved rails, not forgetting of course you have to lay them in pairs with the inside rail having a tighter curve than the outside one but still maintaining that 4 feet, 8 and a half inches, and it must be even harder when a line is double track, i.e. four curved rails.
After it explains that the straight rails (21 feet in length) must be laid exactly that, straight and free from twists and slight bends, it states the following (exact wording and punctuation):
"and in the curves must be bent and worked to the arc of the curve."
What does this mean exactly?
The contractor has to take straight rails and bend them?
The company will supply curved rails but you have to ensure the curve is the exact arc required?
And in any case, how on site would you bend the rails to the exact arc?
The drawings as mentioned for any line by the L&Y would always start with No. 1 Plan and No.2 Section. Now as a contractor you need to know what arc of a curve is required and where, so I presume one of these two drawings (perhaps numbered 2a, 2b etc) would have an exact track diagram of the new route?
It must have been far more time consuming to lay curved rails, not forgetting of course you have to lay them in pairs with the inside rail having a tighter curve than the outside one but still maintaining that 4 feet, 8 and a half inches, and it must be even harder when a line is double track, i.e. four curved rails.