• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Rail traffic from Melton Ross Quarry, N Lincs.

Status
Not open for further replies.

SomeTrainboy

Member
Joined
30 Aug 2024
Messages
51
Location
NE Lincs
Since this quarry supposedly produces up to 400,000 tonnes of lime and a million tonnes of chalk, the road traffic out of it must be quite large. How much of it could be delivered by rail?

The sidings were closed in the early '80s, and according to my father, trialled the idea of loading on the up main in the late '80s. How economical would it be to re-instate the sidings, which I'm pretty sure remain in-situ?

Re-signalling wouldn't be too hard, as there already a signal gantry to the east, and you can erect one near to the A18 bridge. And since there have been rumours of a hydrogen plant being cleared for construction literally opposite, I believe it would be a good investment to aid in freeing up road traffic.
 
Last edited by a moderator:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Acathater

Member
Joined
11 Dec 2025
Messages
751
Location
NorthWest
I rather suspect the problem would be the number of destinations - presumably the lime is mainly going to numerous cement / concrete plants across the country, few of which would be big enough to need trainload deliveries
 
Status
Not open for further replies.

Top