I've not read through the 70 plus pages of comments so what I'm about to say may already have been mentioned, if it has, I apologise in advance.
My understanding is that Network Rail's proposals include what is quite a substantial change to the organisational structure of the organisation resulting in significant staff reductions along with skill changes. According to the requirements of the Railway and Other Guided Transport Systems (Safety) regulations such change must be assessed in accordance with the Safety Management System (SMS).
Does anyone actually know if this has taken place? One of the first steps for such an assessment is a Hazard Identification Workshop (HAZID), this should be undertaken with all stakeholders - which I would assume would include staff representatives - and the output would be a list of hazards and risks identified. Does anyone know if this has happened yet? Has the Hazard and Risk list been made available to all stakeholders? Have mitigitations been identified for all entries?
If this has not happened, is this something the RMT should be getting interested in and, if the list has not been released, should the RMT ask for it as a Freedom Of Information Request?