Railsigns
Established Member
- Joined
- 15 Feb 2010
- Messages
- 2,754
ATP was then, as now, only fitted to GWML and Chiltern
The Cambrian Lines also have ATP, as part of ETCS Level 2.
ATP was then, as now, only fitted to GWML and Chiltern
So in other words politics stopped it from happening sooner and less politics might have saved lives. Or is that an unfair thing to say. I'm an outsider.
ATP is difficult to overlay on existing signalling systems without adversely affecting train performance. This is particularly true on a mixed traffic railway where different trains have different stopping distances. The potential is that lighter, more stoppable, trains are stopped prematurely. Conversely, heavy trains with a long stopping distance might still overrun. It is also expensive.
This was where BR started the development of TPWS. As originally conceived, it is a system that uses a sort of best case analysis to stop any train which will overrun a danger signal without guaranteeing that it will always prevent the SPAD or any subsequent collision.
ATP is certainly expensive, but the discussion of the impact of train performance is inaccurate. In a modern system the ATP onboard computer is programmed with the brake rate its train can achieve, and can therefore apply the brakes sooner (if it's a freight train) or later (if it's a modern EMU) - for example.
I have a vague memory of TPWS introduction on the MML being one of the first. Wasn't there talk of it being a poor alternative to ATP, including only being effective below 75mph?
Yup. It was introduced as a knee jerk reaction and much tabloid hysteria.