What sections of the railway network are primarily (still) in place to service the UK nuclear industry?

For example, the branch line from Saxmundham to just beyond Leiston (for Sizewell) and the Cumbrian Coast line to/from Sellafield.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,534
Location
Preston Lancs
The Salwick sidings and box were removed on electrification of Preston to Blackpool of course.

Anything near Dounraey?
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,662
Anything near Dounraey?

Far North Line is used at Georgemas Jn to the south for this.

Wickford to Southminster branch probably wouldn't have survived without Bradwell and indeed was electrified later than the main Shenfield to Southend Victoria line
 

The_Train

Established Member
Joined
2 Jun 2018
Messages
5,247
Am I right in thinking that Crewe Coal Sidings are a secure compound for use by nuclear trains only?
 

Poolie

Member
Joined
30 Jan 2010
Messages
198
The Seaton Snook branch serves Hartlepool Power Station. The line was originally built to serve a Zinc works
 

furnessvale

Established Member
Joined
14 Jul 2015
Messages
4,914
The Salwick sidings and box were removed on electrification of Preston to Blackpool of course.
Sadly, the industry seems only to be interested in moving hazardous waste by rail. Everything else goes by road.
 

Mcr Warrior

Veteran Member
Joined
8 Jan 2009
Messages
17,292
What's the position with the old section of line between Blaenau Ffestiniog and Trawsfynnydd?
 

DDB

Member
Joined
11 Sep 2011
Messages
728
What's the position with the old section of line between Blaenau Ffestiniog and Trawsfynnydd?
I suspect that the vast sums of money that have been spent on repairing the branch from the Llandudno junction to Bleaenau Ffestiniog each time it gets washed out is it least partly inspired by maintaining the possibility of rail access to Trawsfynnydd for the future. However I have no evidence for this.
 

stj

Member
Joined
15 Apr 2019
Messages
324
Sadly, the industry seems only to be interested in moving hazardous waste by rail. Everything else goes by road.
There was a plan to upgrade the rail facility at Salwick in BNFL days to send out fuel rods by rail but it never went ahead.
 