• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Rail in Scottish Programme for Government

Status
Not open for further replies.

Grinner

Member
Joined
21 Feb 2013
Messages
116
Location
Paisley
http://www.gov.scot/Resource/0052/00524214.pdf

We continue to demand the level of service which customers expect from ScotRail and, while the improvements we have seen this year are welcome, there is more to do. A key to improvement is realising the investments that we are working with ScotRail and Network Rail to deliver. We are seeing many of our major projects come to fruition in 2017‑18. Some highlights include:
■■ the Edinburgh to Glasgow via Falkirk High route being served by electric trains in the coming months and adding 26% more seats at peak times
■■ Dundee Station redevelopment being completed by early 2018
■■ refurbished high speed trains being introduced into service by ScotRail between the seven Scottish cities from spring 2018
■■ 75 new sleeper coaches being gradually introduced on overnight services to and from London from April 2018 onwards.
We will go further by developing new proposals to continue the reinvigoration of the Scottish rail network and will take forward work on:
■■ our investment strategy for new track and stations for 2019 onwards
■■ introducing hybrid electric trains
■■ further tackling overcrowding
■■ introducing dedicated carriages for cycles and other outdoor sports equipment on rural routes in the north and west
■■ maximising the local benefits of the route between Girvan and Stranraer
■■ service improvements for the line between Inverness and Wick/Thurso
We fundamentally believe, however, that we could do much more if we had stronger levers over the rail network. The rail network in Scotland is already publicly owned – by the UK Government. In the coming year, we will continue to press for the further devolution of Network Rail in Scotland so that it becomes fully accountable to the Scottish people. We will also make full use of new powers provided through the Scotland Act to allow public sector bodies to bid for future Scottish rail franchises. In 2017-18, we will identify a suitable public body to make a robust bid for the next ScotRail franchise contract and confirm the next steps for the preparation of a bid.
I note mention of hybrid trains, which may mean we won't be seeing electrification extended towards Aberdeen/Dundee/Fife?

Service improvements from the Far North line might include infrastructure such as Lentran Loop? Also I wonder what is meant by "dedicated carriages for cycles and other outdoor sports equipment on rural routes in the north and west"?

More powers over Network Rail and a public sector operator for ScotRail are not really a surprise.
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Clansman

Established Member
Joined
4 Jan 2016
Messages
2,651
Location
Scotland
To be fair the programme is only for 2017-18, so there's no chance electrification of anywhere North of Dunblane being included.
 

clc

Established Member
Joined
31 Oct 2011
Messages
1,326
Could they be considering running hybrid trains to Stranraer and Dumfries?*

*after the wires reach Kilmarnock.
 
Last edited:

NotATrainspott

Established Member
Joined
2 Feb 2013
Messages
3,304
Fitting dedicated luggage/activity compartments to the rural trains is almost certainly dependent on new trains. I wonder if they're looking at the cost of new trains and thinking of replacing the 156s and 158s sooner rather than later.
 

sjoh

Member
Joined
7 Apr 2016
Messages
372
Location
London, E11.
How are they planning to gradually introduce the new sleeper carriages? Are Mk3 and Mk5s compatible with each other?
 

signallerscot

Member
Joined
20 Sep 2016
Messages
200
Location
Scotland
Fitting dedicated luggage/activity compartments to the rural trains is almost certainly dependent on new trains. I wonder if they're looking at the cost of new trains and thinking of replacing the 156s and 158s sooner rather than later.

Stripped out class 153s from England when they become available..? Though it'd require a rethink of how splitting/joining services on the West Highland Line operate.
 

gsnedders

Established Member
Joined
6 Sep 2015
Messages
1,472
How are they planning to gradually introduce the new sleeper carriages? Are Mk3 and Mk5s compatible with each other?

They're not, but they're going to be Lowlander first (and I presume only in one direction per-night first, too). Of the four trains (in/out of London) per night, they'll gradually take them over one by one, I expect.
 

47271

Established Member
Joined
28 Apr 2015
Messages
2,983
No mention of how the lives and safety of passengers will be transformed by Police Scotland absorbing the activities of BTP. :(
 
Status
Not open for further replies.

Top