cyclebytrain
Member
- Joined
- 11 Jul 2009
- Messages
- 311
I was travelling on a 395 today that has had its additional dampers fitted and was being monitored by a Hitachi employee -I had a brief chat with him (I was very disappointed that the 395s don't have accelerometers that can be downloaded remotely and that they have to send someone out to stick a box of them onto the train). Apparently one of the problems is that HS1 needs rail grinding and that hasn't been done because Network Rail don't have a rail grinder that can be used on HS1.
Thinking about this later it seemed ridiculous, so I wonder if I misunderstood him... So, does anyone know: can Network Rail grind HS1 and have they (or anyone else for that matter) done it?
Thinking about this later it seemed ridiculous, so I wonder if I misunderstood him... So, does anyone know: can Network Rail grind HS1 and have they (or anyone else for that matter) done it?