Speaking of Immingham, I've seen a noticeable lack of trains into it, specifically iron ore and biomass, anyone know why?
IBT, the ore terminal is down for maintenance/issue with the bunkers. Trains are due to restart next week. Don't know what the score is with the biomass.
I think the biomass was the same with some sort of planned maintenance shutdown - every few months you get a full week with no Immingham biomass trains and they run from Hull instead (3 per day ran from Hull this week, so less frequent than the Immingham trains normally are).
I don't think there has been any coal, coke, iron ore or biomass this week from Immingham, which suggests a co-ordinated shutdown that would also allow for track maintenance in the terminals and on the docks branch between Humber Road Jn and Immingham West Jn.
Have trains always had to be cut into two before being shunted into Coopers Metals? From aerial photos, it looks like there are 3 sidings at the location?
A comment by David J. Hayes under one of the pics I linked in
post #2730 mentions that after splitting the 24 wagons, 7 were placed in one siding and 5 on another at EMR. I think the need to use Queen's Head sidings on the other side of the line arises both from the length of the train (too big to fit into EMR sidings in one go) and the fact that the only run round facility at Handsworth is in Queen's Head sidings. I don't know exactly how the sequence of shunts works but it sounds quite complicated.
Scrap metal out of Handsworth is also scheduled to run this coming week 26th October.
Thursday is Handsworth to Alexandra Dock on that day only
Handsworth to Worcester Fridays 2/10/26 to 11/12/26
A new 6V45 Brierley Hill-Cardiff train has also appeared
I think those WTT schedules towards South Wales from Handsworth and Brierley Hill might have appeared in connection with the upcoming change from DB Cargo to GBRF haulage on the 7Steel (previously Celsa) scrap trains to Cardiff Tidal. From 5th October onwards, GBRF seem to inherit schedules from Cardiff Tidal to Sunderland / Rotherham Masborough / Kingsbury / Saltley / Swindon (plus Burton for the wire rod train). Being WTT schedules, they might include potential traffic sources that don't materialise - at the moment Sunderland and Rotherham are the regular sources of scrap by rail into Tremorfa.