An interesting article by Steve Broadbent (always enjoy his infrastructure articles) on future improvements in Scotland. However, anyone notice this tasty snippet buried in Steve's precis of the issues hindering speeding up Edinburgh/Glasgow to Aberdeen.
Doubling or renewing the Montrose basin viaduct has major environmental concerns...cost, around 70m.
However, and I quote..."one option considered since publication of the draft RUS is to reopen the former forty four and a half mile route from Kinnaber Junct to Stanley Junct (just North of Perth) at a cost of about 700m"
Wow, now that would be something else, putting Couper Angus and Forfar back on the map to boot. I have been on at least two 'last trains to Forfar' in the late 60s/early 70s...indeed one aws hauled by a 50 on a layover from Crewe to Perth working: the other a brake van trip, with a 26. Forfar stayed open for a while for freight (potatoes, oil, coal).
So we could see A4s thrashing up the Strathmore, 3 hours Glasgow to Aberdeen!
Doubling or renewing the Montrose basin viaduct has major environmental concerns...cost, around 70m.
However, and I quote..."one option considered since publication of the draft RUS is to reopen the former forty four and a half mile route from Kinnaber Junct to Stanley Junct (just North of Perth) at a cost of about 700m"
Wow, now that would be something else, putting Couper Angus and Forfar back on the map to boot. I have been on at least two 'last trains to Forfar' in the late 60s/early 70s...indeed one aws hauled by a 50 on a layover from Crewe to Perth working: the other a brake van trip, with a 26. Forfar stayed open for a while for freight (potatoes, oil, coal).
So we could see A4s thrashing up the Strathmore, 3 hours Glasgow to Aberdeen!