• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Question about terminology

Status
Not open for further replies.

Worm

Member
Joined
13 May 2020
Messages
105
Location
Manchester
Hello,

I’m still fairly new to this and two regular terms crop up I can’t find a definition for on the forum or Google (which gets itself confused with other things in the results).

Basically please could someone explain what signing (e.g. a depot/staff don’t sign a specific rolling stock type) and diagrams are.

Diagrams I’ve taken to mean a specific train in terms of time and location, for example a hypothetical 15:05 to Oxford from Manchester.

thanks.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,287
Location
Glasgow
Hello,

I’m still fairly new to this and two regular terms crop up I can’t find a definition for on the forum or Google (which gets itself confused with other things in the results).

Basically please could someone explain what signing (e.g. a depot/staff don’t sign a specific rolling stock type) and diagrams are.

Diagrams I’ve taken to mean a specific train in terms of time and location, for example a hypothetical 15:05 to Oxford from Manchester.

thanks.

Signing a type of stock means that a driver is fully trained in its operation and can drive it, not signing it means a driver can't drive it as they aren't familiar with it essentially, the same applies to guards.

Signing a route means a driver is familiar with it, all the speed restrictions, gradients, signals, level/foot crossings, junctions, stations etc and is thus allowed to drive trains on this route - also known as route knowledge. Again guards will sign certain routes as well.


Diagrams are a set of train services a particular train (locomotive or multiple unit) will operate on a given day. So one train might start in London, work to Manchester, return to London, go up to Glasgow etc and the entire set of services would be the whole diagram.
 

MidnightFlyer

Veteran Member
Joined
16 May 2010
Messages
12,856
'Signing' is a crew member's knowledge of either a route or form of traction - if they 'sign' a route or type of traction, they can work them.

Diagrams are the body of work on any given day for a resource (be they traincrew or physical units) - e.g. a Driver on Avanti West Coast may do Glasgow - Preston - Glasgow as a day's work - that is their diagram.
 
Status
Not open for further replies.

Top