Imagine a fairly mundane two track railway controlled by Absolute Block signalling. No junctions or sidings. Just plain track.
Along the route are manual signal boxes - let’s say spaced every 10 miles. Trains run once every two hours.
Train one leaves the section controlled by signal box “A”, into the area operated by “B” then onto “C” and so on.
Train two is now operating. And I’m curious about the order of events. Train two now needs to leave the area controlled box box “B” heading to box “C”.
Does box “B” have to request line is clear from box “C” immediately before sending train two on its way or does box “C” have to give line clear as soon as train one has passed.
I suppose in a nutshell I’d like to know who is supposed to take the initiative - box “b” for requesting the line is clear or box “C” for saying the line is clear ?
Along the route are manual signal boxes - let’s say spaced every 10 miles. Trains run once every two hours.
Train one leaves the section controlled by signal box “A”, into the area operated by “B” then onto “C” and so on.
Train two is now operating. And I’m curious about the order of events. Train two now needs to leave the area controlled box box “B” heading to box “C”.
Does box “B” have to request line is clear from box “C” immediately before sending train two on its way or does box “C” have to give line clear as soon as train one has passed.
I suppose in a nutshell I’d like to know who is supposed to take the initiative - box “b” for requesting the line is clear or box “C” for saying the line is clear ?