There was a protest at the station this week about a leaked letter showing the government was actually in favour of introducing the barriers and wanted this done as soon as possible.
The timeline that has lead up to this is as follows.
In November 2009, Sheffield City Council rejected the plans on the grounds that the barriers would affect the character of the listed building.
Then in April 2010 the former transport secretary Lord Adonis said barriers would not be installed before a new footbridge was built.
In a statement, the current Transport Minister Norman Baker said ticketless travel at Sheffield cost more than £2m each year.
How do they get the £2 million figure?
What do the forum members think? Do they actually work ?
The timeline that has lead up to this is as follows.
In November 2009, Sheffield City Council rejected the plans on the grounds that the barriers would affect the character of the listed building.
Then in April 2010 the former transport secretary Lord Adonis said barriers would not be installed before a new footbridge was built.
In a statement, the current Transport Minister Norman Baker said ticketless travel at Sheffield cost more than £2m each year.
How do they get the £2 million figure?
What do the forum members think? Do they actually work ?