While reading the August copy of Modern Railway's, the article "New Services from Chester. (Pages 49 - 51). I noticed on the map on page 50 that it showed 4 proposed stations. These were 'Queensferry' on the North Wales line, 'Deeside Industrial Park' (such a snappy name) on the Borderlands line and Wrexham South & Wrexham North. It was Wrexham North that interested me, as it was the only one which would be on a stretch of single track. This would, I assume cause capacity problems on the Saltney Junction to Wrexham line, despite it being doubled to Rossett.
Wrexham North would be on the single line south of Rossett. Even if only one train an hour called in each direction, that would restrict the capacity of the line simple because the train would be occupying the single line longer. I would have thought that this could cause a problem. I believe that the doubling through from Rossett to Wrexham was not done because the DaFT at some point in the past when building the A483, only built the bridges to single track width. Yet again show the critical narrow minded foresight we have come to expect from those people at DaFT. Having looked on Google Earth (Not actually living near enough to visit. I have come to the conclusion, that the obvious solution to the problem would be to double the line from Wrexham to just past the sight of the Wrexham North station, not only meaning that trains could pass each other at the Wrexham North station, plus the length of single track would be reduced by at least a mile, maybe more, with added capacity benefits.
However the potential site of the station would probably be between the two bridges of the A483 which cross the Wrexham to Chester line. Unless it is possible to get a double track through the most southerly bridge, then there will be capacity problems.
I do have a potential solution to this problem, but I must admit that it is in the realms of fantasy in expecting that the DaFT would realise that the problem was caused by the bridges being built incorrectly and they would use the road budget to rebuild the bridges for double track. This might stop other short sighted solution to save money (and thereby costing more in the future) by doing things right first time. But I wont hold my breath.
Could anyone tell me if it is possible to at least double track through the A483 nearest to Wrexham so that the double track can be extended to the proposed Wrexham North station site, or am I just whistling in the wind.
Thank you all.
Wrexham North would be on the single line south of Rossett. Even if only one train an hour called in each direction, that would restrict the capacity of the line simple because the train would be occupying the single line longer. I would have thought that this could cause a problem. I believe that the doubling through from Rossett to Wrexham was not done because the DaFT at some point in the past when building the A483, only built the bridges to single track width. Yet again show the critical narrow minded foresight we have come to expect from those people at DaFT. Having looked on Google Earth (Not actually living near enough to visit. I have come to the conclusion, that the obvious solution to the problem would be to double the line from Wrexham to just past the sight of the Wrexham North station, not only meaning that trains could pass each other at the Wrexham North station, plus the length of single track would be reduced by at least a mile, maybe more, with added capacity benefits.
However the potential site of the station would probably be between the two bridges of the A483 which cross the Wrexham to Chester line. Unless it is possible to get a double track through the most southerly bridge, then there will be capacity problems.
I do have a potential solution to this problem, but I must admit that it is in the realms of fantasy in expecting that the DaFT would realise that the problem was caused by the bridges being built incorrectly and they would use the road budget to rebuild the bridges for double track. This might stop other short sighted solution to save money (and thereby costing more in the future) by doing things right first time. But I wont hold my breath.
Could anyone tell me if it is possible to at least double track through the A483 nearest to Wrexham so that the double track can be extended to the proposed Wrexham North station site, or am I just whistling in the wind.
Thank you all.