I suspect that only having one bay platform is the issue. Wasn't there talk at one stage of a turn back facility at Wallington? https://www.railforums.co.uk/thread...ia-west-croydon-services.239022/#post-5913474Is it not possible to get West Croydon to more than 4tph?
The turnback siding west of West Croydon is occupied for a large part of the hour turning the Southern services, which is why some Southern peak extras run on to Sutton.