Proposed new TEP at Stromeferry on the Kyle Line

Status
Not open for further replies.

Sulzer023

Member
Joined
17 Feb 2011
Messages
54
I have read this week that there is a proposal to install a RETB Token Exchange Point at Stromeferry. Does anyone have any further info on this please? I would like to find out what the timescale might be and if the TEP will apply to both Up and Down trains.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Agent_Squash

Established Member
Joined
22 Jul 2016
Messages
1,271
RETB = Radio Electronic Token Block
TEP was already defined after RETB :)
 

adrock1976

Established Member
Joined
10 Dec 2013
Messages
4,450
Location
What's it called? It's called Cumbernauld
Regarding Stromeferry station, is that still single platform? I'm trying to visualise how it would work if that is still the case.

I understand how it works at Arrochar & Tarbet, Ardlui, and Crianlarich to namecheck some of the stations on the West Highland line, but they are passing points with two platform faces.
 

alangla

Member
Joined
11 Apr 2018
Messages
1,178
Location
Glasgow
Is this to allow for more use of the mega level crossing? (I.e. the bit of the Stromeferry bypass that has been diverted onto the railway to allow the road to be repaired) - AIUI, it’s shut whenever there’s a train in section so a shorter section would presumably mean shorter closures
 

Sulzer023

Member
Joined
17 Feb 2011
Messages
54
Is this to allow for more use of the mega level crossing? (I.e. the bit of the Stromeferry bypass that has been diverted onto the railway to allow the road to be repaired) - AIUI, it’s shut whenever there’s a train in section so a shorter section would presumably mean shorter closures

There are several TEP's over the Highlands used away from passing loops, one example being Fodderty on the Kyle line. This is used in the Up direction to allow trains to leave Garve towards Dingwall if something is approaching Dingwall from the Far North line - a bit like an outer home signal in old money.
 

Sulzer023

Member
Joined
17 Feb 2011
Messages
54
Is this to allow for more use of the mega level crossing? (I.e. the bit of the Stromeferry bypass that has been diverted onto the railway to allow the road to be repaired) - AIUI, it’s shut whenever there’s a train in section so a shorter section would presumably mean shorter closures
Engineering work is quoted as one of the benefits which would include work on the rock faces. Actually last autumn, due to the unacceptable delays to road traffic caused by the 40 odd minute section, temporary stop and distant boards were installed either side of the work with drivers given permission to proceed only to the stop board when receiving the token. Apparently hand signalmen then allowed the moved to pass the board when the line was clear.
However the main benefit would be to shorten the sections from Strathcarron to Kyle increasing line capacity but I don't know yet if this will apply in both directions
 

Sulzer023

Member
Joined
17 Feb 2011
Messages
54
Sorry, my first reply above has the wrong quote shown - it is meant for adrock1976's post.
 

Maxfly

Member
Joined
9 Mar 2010
Messages
269
Location
Scotland
Regarding Stromeferry station, is that still single platform? I'm trying to visualise how it would work if that is still the case.

I understand how it works at Arrochar & Tarbet, Ardlui, and Crianlarich to namecheck some of the stations on the West Highland line, but they are passing points with two platform faces.
Stromeferry is a single line, the old platform is still extant but would obviously need work if it were to be returned as a crossing point along with associated points and track etc.
If it stays as single line it would be similiar to Corrour (minus sidings) so UP and DN direction stop boards and SLB’s/LCMB’s (Station Limit Boards/ Loop Clear Marker Boards) provided so section is split in both directions it no ability to cross trains.
It would likely be an Intermediate Token Exchange Point and I would suggest a Long Section Token would be available through it.
 

adrock1976

Established Member
Joined
10 Dec 2013
Messages
4,450
Location
What's it called? It's called Cumbernauld
There are several TEP's over the Highlands used away from passing loops, one example being Fodderty on the Kyle line. This is used in the Up direction to allow trains to leave Garve towards Dingwall if something is approaching Dingwall from the Far North line - a bit like an outer home signal in old money.

Engineering work is quoted as one of the benefits which would include work on the rock faces. Actually last autumn, due to the unacceptable delays to road traffic caused by the 40 odd minute section, temporary stop and distant boards were installed either side of the work with drivers given permission to proceed only to the stop board when receiving the token. Apparently hand signalmen then allowed the moved to pass the board when the line was clear.
However the main benefit would be to shorten the sections from Strathcarron to Kyle increasing line capacity but I don't know yet if this will apply in both directions

Sorry, my first reply above has the wrong quote shown - it is meant for adrock1976's post.

Stromeferry is a single line, the old platform is still extant but would obviously need work if it were to be returned as a crossing point along with associated points and track etc.
If it stays as single line it would be similiar to Corrour (minus sidings) so UP and DN direction stop boards and SLB’s/LCMB’s (Station Limit Boards/ Loop Clear Marker Boards) provided so section is split in both directions it no ability to cross trains.
It would likely be an Intermediate Token Exchange Point and I would suggest a Long Section Token would be available through it.

Many thanks for the explanations of how it all works.
 

TT-ONR-NRN

Veteran Member
Joined
30 Dec 2016
Messages
12,891
Location
Cambridge
I read the title as Proposed new IEP and had a lot of questions as to why one would go to Stromeferry :lol:

Are these linked to the works that will involve a split of Highland services and request stop buttons?
 

Railsigns

Established Member
Joined
15 Feb 2010
Messages
2,754
The new RETB token exchange point at Stromeferry was brought into use last weekend (24th April). This is, I think, the first new RETB TEP since the 1980s.

Long section tokens are available between Strathcarron and Kyle of Lochalsh in both directions. A new "occupied" token can be issued to a Down train at Stromeferry, allowing it to arrive at an occupied platform at Kyle.

Also as part of this work, redundant data and tokens associated with the former sidings at Muir of Ord were removed from the Dingwall SSI interlocking and the signaller's VDU screens updated. A third screen has been added to the Inverness West RETB workstation showing the TEPs at Stromeferry and Kyle.
 

Gloster

Veteran Member
Joined
4 Sep 2020
Messages
13,043
Location
Up the creek
According to the Journal of the Highland Railway Society the purpose is to ease operations when a charter needs to be shunted at Kyle.
 

High Dyke

Established Member
Joined
1 Jan 2013
Messages
5,022
Location
Yellabelly Country
There are several TEP's over the Highlands used away from passing loops, one example being Fodderty on the Kyle line. This is used in the Up direction to allow trains to leave Garve towards Dingwall if something is approaching Dingwall from the Far North line - a bit like an outer home signal in old money.
Spotted that the other day on a Kyle line cab ride YouTube video. Thanks for explaining about it, as my initial thought was it seemed a bit pointless.
 