Severe problems at Slough today looks like the engineers broke the signalling overnight.

Rail commuters are facing a morning of travel misery after signalling equipment was damaged near Slough during overnight engineering work.

First Great Western (FGW) is operating a "severely reduced" service into Paddington, adding up to an hour to journeys.

The rail company has advised passengers to avoid travelling between Reading and Paddington.

It said the disruption would continue until at least midday.

A message on the FGW website said: "Following overnight engineering work, signalling equipment has been damaged between Slough and West Drayton affecting all four lines. Because of this, a severely disrupted train service is operating between Reading and London Paddington this morning.

"Many services will be cancelled and there will be delays of up to 60 minutes affecting those trains which can run. We strongly advise customers to avoid travelling where possible. Disruption is expected to last until at least 12:00 today.

"At present, we are expecting to be able to run four trains per hour in each direction between Reading and Paddington. Your tickets will be valid on other operators' services and on alternative routes which avoid the affected area."

http://www.bbc.co.uk/news/uk-england-berkshire-29503523
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

cf111

Established Member
Joined
13 Nov 2012
Messages
1,393
Paddington was not a nice place this morning. Was planning on sampling the Pullman dining aboard the 1130 to Penzance but that train was started at Bristol.
 

ess

Member
Joined
9 Feb 2010
Messages
572
Presumably something to do with the electrification work overnight?
 

Kentish Paul

Member
Joined
25 Apr 2012
Messages
454
Location
Ashford Kent
An bad day indeed.

Intended to travel on the 09:42 from Castle Cary to Paddington. I'd heard about the disruption and checked websites etc, but no mention of the 09:42 so was driven to Castle Cary arriving at 09:15. Checked the display wich showed the 09:42 as on time. Went to platform 2 and waited. (Castle Cary to Taunton closed for flood prevention measures which was previously published).

The train was announced at 09:39 but never appeared. A FGW employee arrived to release the wheelchair ramp for the 09:55 to Bristol who then said if you want to go to London get this train and change at Westbury. (No mention that the 09:42 had been cancelled)!

So off to Westbury (having asked the guard if my London Terminals ticket (route any permitted) was valid to go back via Dorchester and onward to Waterloo and told emphatically NO.)

At Westbury the 11:01 to Paddington was shown as on time so everyone took a sigh of relief. It then disappeared from the screens. Platform staff then advised that passengers for London should get a train to Salisbury and take SWT to Waterloo. I must say the staff at Westbury were very good including a chap who may have been the station manager. Very calm and offering logical advice.

Next to Salisbury on the 11:11 where I caught the 12:21 to Waterloo arriving at 13:50, only 2.5 hrs later than my intended arrival at Paddington.:cry:

Just as well I wasn't in a hurry.
 

GodAtum

On Moderation
Joined
11 Dec 2009
Messages
2,684
Just my luck, the 0855 from Paddington - Maidenhead was cancelling so I missed my connection to Marlow. I got on the 0913 then had a 20 mins wait for the train to Marlow.
 

Flamingo

Established Member
Joined
26 Apr 2010
Messages
6,806
Can Network Rail be officially classified as an "Act of God", I wonder?

Thank God I'm on a few days off...
 