It apoears that Manchester to North wales services are suspended between Manchester and Warrington BQ due to over running engineering work.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,940
Location
Mold, Clwyd
Overrunning engineering works (electrification?) at Eccles, now apparently cleared.

But there is severe disruption between Shrewsbury and Wolverhampton, again from overrunning engineering works near Wolverhampton.
Anyone know what these were?
Cambrian trains diverting to Crewe all day Tuesday, bus Telford-Wolverhampton, train shuttle Shrewsbury-Telford.
 

hairyhandedfool

Established Member
Joined
14 Apr 2008
Messages
8,837
The Eccles one apparently was a 'broken down' road/rail vehicle. All services were cancelled between Newton-le-Willows and Manchester with service resuming around 0800.
 
Status
Not open for further replies.

Top