No, we cannot. Those curves are perfectly ok for a small standard gauge loco. There were many industrial locations in this country that had similar curves and a small wheelbase SG loco.
The OS map would show any parallel lines if there were any and the connection into the sidings is pretty clear to see, as well as the absence of any transshipment facilities.
I fully agree that there is no reason why the lines in the gas works were not standard gauge
As others have said those curves look fine for the wagons of the time
I think we are all in agreement that the internal track of the gas works was indeed standard gauge. Attached is my crude attempt to draw the layout as it would have been circa 1923 which appears on the 1931 OS map.
The black track is the original, the blue are the new additions. I've also included the sidings that were added to the railway goods yard circa 1900/5, these sidings were known as the "gas sidings". Note - I've not included the railway sidings in this one.
Rule three of research: never rely on people’s memories.
I've learnt that the hard way! I would suggest anyone who is going to research a line that went in the 1960's to get on with it sooner rather than later.
Lever Bros' Port Sunlight Works had an extensive narrow gauge system for internal movement of the 'products' as well as a large standard gauge system. The large scale OS maps of the period correctly distinguish between the two and no doubt would have done so had Gt Harwood had a ng system.
Yes, I agree the OS maps are generally accurate in detail and I also agree that any such parallel NS gauge at the gas works would have been shown - which it's not.
The other point I want to re-iterate are the specific details of all the private sidings on the old branch line in the L&Y society book I have about the line. They state very clearly
Padiham's gas works did have a NS gauge track -
there is no mention at all that the one at Great Harwood gas works was. I'm sure it would have been mentioned.
13 wagons a day would have meant one shunt move in and out per day taking a few minutes, likely at (e.g.) 11 in the morning or 2 in the afternoon so it would hardly bring the town to a stand
I agree with that too, even if you were on the road waiting (with the level crossing gates blocking the lane) you could always have turned around and gone round another couple of streets to end up on the other side of the lane - I've seen a few people do similar things at level crossings when they are closed to road traffic.
Question please:
Given that a railway company engine was not allowed out of the goods yard to cross the lane, would a private company shunter be allowed into the railway's goods yard?
On the attached diagram, inside the railway goods yard there is a head shunt (bottom right), I just wonder would a private shunter pull empty wagons or coke filled wagons all the way into the goods yard, detach and run round and back out again - would that have been allowed? probably not?