So far it's the Emerging Preferred Route (EPR), rather than the final route, according to Mr Michael Nolan, CEO of Transport Infrastructure Ireland. Public consultation on the project gets under way immediately with the line scheduled to be operational in 2027
More information (key fact, maps &c): Metrolink site
SourceThe proposed 26km route will run from Estuary, north of Swords in the north of the city to Sandyford in the south, via the airport and the city centre. The line will include two underground sections, with the first running beneath the airport, and the second running from the south of Dublin City University beneath the city centre and emerging close to Charlemont, where the line will join the existing Luas Green Line alignment to Sandyford. The Green Line will be upgraded for metro operation as part of the project.
The line will have 25 stations, 15 of which will be new metro stations, and is forecast to carry 15,000 passengers per hour per direction at peak times when it opens in 2027. The line is expected to operate 30 trains per hour in each direction and use trains of more than 60m in length while the project is anticipated to create 4000 jobs during construction.
More information (key fact, maps &c): Metrolink site
The MetroLink project is the development of a north-south urban railway service that will run between the busy corridor of Swords and Sandyford, connecting key destinations including Dublin Airport and the City Centre along the 26km route.
A large proportion of the route will be underground, including where it passes under the important city centre area and Dublin Airport. The underground section will terminate close to Charlemont Stop on the Luas Green Line South City Area, where the metro will rise up and connect to, and runs southwards on, the existing Luas Green Line. The Luas Green Line will be upgraded to metro standard as part of the project....