A few months ago it was reported on this thread:
www.railforums.co.uk
that the points from the ECML to the disused Powderhall Branch had been removed and replaced with plain line, following a broken rail there. The suggestion was that this was an overdue removal of the pointwork, as the line has been disused for at least 7 years (it was last used by "binliner" trains hauling refuse from the Powderhall Waste Transfer Depot) and there are no plans for it to reopen.
I live next to the branch line, a long way from the junction; despite being that far away I've received a "neighbour notification" letter from Network Rail warning me of work on Christmas Day and Boxing Day for tamping the points at the junction.
This presumably means that the points are being reinstated. My question is : why are Network Rail doing that, rather than leaving it as plain line, when there seem to be no plans to use the branch again, and an intention (from the City Council) eventually to turn it into a footpath/cycleway?
Broken Rail at Edinburgh ,-28/04/2023
See a broken rail is causing problems southbound on the East Coast from Edinburgh. Why are there more problems of broken rails, is it poor maintenance checks? https://www.nationalrail.co.uk/service-disruptions/edinburgh-20240428/
that the points from the ECML to the disused Powderhall Branch had been removed and replaced with plain line, following a broken rail there. The suggestion was that this was an overdue removal of the pointwork, as the line has been disused for at least 7 years (it was last used by "binliner" trains hauling refuse from the Powderhall Waste Transfer Depot) and there are no plans for it to reopen.
I live next to the branch line, a long way from the junction; despite being that far away I've received a "neighbour notification" letter from Network Rail warning me of work on Christmas Day and Boxing Day for tamping the points at the junction.
This presumably means that the points are being reinstated. My question is : why are Network Rail doing that, rather than leaving it as plain line, when there seem to be no plans to use the branch again, and an intention (from the City Council) eventually to turn it into a footpath/cycleway?