• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Powderhall Branch Junction, Edinburgh - future use?

Status
Not open for further replies.
Joined
28 Nov 2021
Messages
372
Location
Leith
A few months ago it was reported on this thread:


that the points from the ECML to the disused Powderhall Branch had been removed and replaced with plain line, following a broken rail there. The suggestion was that this was an overdue removal of the pointwork, as the line has been disused for at least 7 years (it was last used by "binliner" trains hauling refuse from the Powderhall Waste Transfer Depot) and there are no plans for it to reopen.

I live next to the branch line, a long way from the junction; despite being that far away I've received a "neighbour notification" letter from Network Rail warning me of work on Christmas Day and Boxing Day for tamping the points at the junction.

This presumably means that the points are being reinstated. My question is : why are Network Rail doing that, rather than leaving it as plain line, when there seem to be no plans to use the branch again, and an intention (from the City Council) eventually to turn it into a footpath/cycleway?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

leightonbd

Member
Joined
4 Oct 2013
Messages
366
Location
Was Edinburgh (South Sub) but more Strathspey now.
A few months ago it was reported on this thread:


that the points from the ECML to the disused Powderhall Branch had been removed and replaced with plain line, following a broken rail there. The suggestion was that this was an overdue removal of the pointwork, as the line has been disused for at least 7 years (it was last used by "binliner" trains hauling refuse from the Powderhall Waste Transfer Depot) and there are no plans for it to reopen.

I live next to the branch line, a long way from the junction; despite being that far away I've received a "neighbour notification" letter from Network Rail warning me of work on Christmas Day and Boxing Day for tamping the points at the junction.

This presumably means that the points are being reinstated. My question is : why are Network Rail doing that, rather than leaving it as plain line, when there seem to be no plans to use the branch again, and an intention (from the City Council) eventually to turn it into a footpath/cycleway?
I’m in Edinburgh too, and walk close to there often, but what is more relevant is that someone much wiser than me once said, on this forum, that ‘the railway works from the railway’ and maybe they want to be able to send a train down there which will remove track, ballast, other valuable kit, etc?
 

mcmad

Member
Joined
11 Mar 2015
Messages
1,073
A few months ago it was reported on this thread:


that the points from the ECML to the disused Powderhall Branch had been removed and replaced with plain line, following a broken rail there. The suggestion was that this was an overdue removal of the pointwork, as the line has been disused for at least 7 years (it was last used by "binliner" trains hauling refuse from the Powderhall Waste Transfer Depot) and there are no plans for it to reopen.

I live next to the branch line, a long way from the junction; despite being that far away I've received a "neighbour notification" letter from Network Rail warning me of work on Christmas Day and Boxing Day for tamping the points at the junction.

This presumably means that the points are being reinstated. My question is : why are Network Rail doing that, rather than leaving it as plain line, when there seem to be no plans to use the branch again, and an intention (from the City Council) eventually to turn it into a footpath/cycleway?
The works at Christmas are to remove the pointwork. When it failed it was only the crossing that was temporarily removed.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,257
The works at Christmas are to remove the pointwork. When it failed it was only the crossing that was temporarily removed.
Presumably once it’s fully plain lined they’ll also be altering the track cant to whatever the normal amount is for the line’s curvature? That would require tamping over quite a significant distance?
 

mcmad

Member
Joined
11 Mar 2015
Messages
1,073
Its only the connection to the branch being removed, the crossover will remain as its also the access to Craigentinny so no change in cant required.
 

rower40

Member
Joined
1 Jan 2008
Messages
578
Is the same fate going to befall the Leith line? If not, what trains are booked (or planned) to use it?
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,257
What happened to the proposal a few years ago to re-double one of the tunnels, and provide a down direction loop via the Abbeyhill curve, wasn’t that going to rejoin the main line where this junction is being removed?
 

InOban

On Moderation
Joined
12 Mar 2017
Messages
4,537
I'm sure there are plans in drawers...
There are certainly plans to create additional through platforms on the North side of Waverley to allow more trains to run through eg Fife to the Borders or North Berwick. and reopening the Abbeyhill loop would help.
 
Joined
28 Nov 2021
Messages
372
Location
Leith
What happened to the proposal a few years ago to re-double one of the tunnels, and provide a down direction loop via the Abbeyhill curve, wasn’t that going to rejoin the main line where this junction is being removed?
Yes, the loop via Abbeyhill rejoins the ECML at the same junction

== Doublepost prevention - post automatically merged: ==

Would be better to turn it into another mixed used cyclepath/active travel path,
That is the City Council's plan:

 
Last edited:
Status
Not open for further replies.

Top