edwin_m
Veteran Member
I can just imagine the disruption to local residents and the local road traffic that aspiration to extend the tramway from Fleetwood to Poulton-le-Fylde would bring. Pay a visit to Manchester, where a swathe of disruption cut through the heart of the inner city core for what seems like eons in order that the 2CC Manchester Metrolink line could be installed.
Looks to me quite easy. New tram junction and a few hundred metres of off-street tramway alongside Copse Road, through the junction with the A585 (which would be signalled) and clip the corner off a fixed caravan park to pick up the trackbed just south of where the A585 crosses it. Then follow the trackbed to Poulton, and optionally continue as tram-train to Preston. There would be no street running and no property demolition except relocation of some of the fixed caravans.
