Eagle
Established Member
Snow Hill to Moor Street AND to just after Bordseley (Just before the viaduct) OR Tyseley.
That's not single track...
Snow Hill to Moor Street AND to just after Bordseley (Just before the viaduct) OR Tyseley.
That's not single track...
Oh? I thought single track means two tracks each with different directions? By the way, four tracks is still needed if Camp Hill and Sutton park line is to be opened.
Oh? I thought single track means two tracks each with different directions? By the way, four tracks is still needed if Camp Hill and Sutton park line is to be opened.
Unfortunately I'd have to agree. Should never have been done in the first place but there's no real case for re-instatement.Doesn't actually need it though; the current timetable works fine, and there's no need for more trains to Weymouth as it is...
And of course there's no scope for freight round Dorchester anyway.
Well there's that new quarry at Woodsford which would be easy to run a line into......And of course there's no scope for freight round Dorchester anyway.
My votes are for Milverton to Gibbet Hill,.
Suspect a lot of people won't know where those places are !
Doesn't actually need it though; the current timetable works fine, and there's no need for more trains to Weymouth as it is...
And of course there's no scope for freight round Dorchester anyway.
My votes are for Milverton to Gibbet Hill, and the Syston south to east curve.
Another vote for Coventry-Leamington.
Maybe not doubling but I think more loops could be useful along Shrewsbury-Machynlleth to allow an hourly service over that section. The crowding on ATW services I experienced yesterday when travelling in the Wrexham area was horrific.
That is being looked at in part due to XC wanting both trains that way.
Ely North Junction - everything to/from 3 directions (Peterborough/Kings Lynn/Norwich) has to go over the same bit of track at the moment preventing a regular half hourly service for Kings Lynn.
Coventry to Leamington, then :P I was being specific.
A very interesting thread. I'm not sure very short sections of single track are too much of a problem. Tonbridge - Hastings has lots of these and manages a fairly intensive service.
I might, however redouble the section through Summerhill Tunnel, as a prelude to re-opening Tonbridge - Brighton via Uckfield as this would add quite a few trains to this section.
Also, I might extend the passing loop at Rye to Winchelsea to give trains a bigger window in which to pass. Might also allow two trains to be flushed through in quick succession if it were split into two sections.
Looked at by whom?
Not sure it would be possible to redouble through Summerhill Tunnel - wasn't this one of the narrow tunnels where the line was singled to allow standard stock to be used rather than just the narrow-bodied "Hastings" gauge Thumpers, "Slim Jim" class 33/2s and 73s?
That aside, another vote for Coventry-Leamington and also Ely North Junction both of which are intensively used.