route:oxford
Established Member
- Joined
- 1 Nov 2008
- Messages
- 4,949
In the GWR Thread, a new method of power-dooring the Mk3 HST stock was raised:-
If this can be done with the Mk3 stock, is there a physical reason why it cannot be done with the Mk2 stock?
Cost is an important aspect, of course.
The coach ends will effectively be chopped off and a new design modular door area will be fitted hence cost saving on measuring each coach on an individual basis.
If this can be done with the Mk3 stock, is there a physical reason why it cannot be done with the Mk2 stock?
Cost is an important aspect, of course.
