If a third platform at Middlesbrough was built I think terminating services there would be a real cost saving.
Other than a very small amount of track access charges, diesel and wear and tear, there would be no saving at all. You would have to totally recast the timetable for it to save any units or crew.
There is no recovery time when services go through to Redcar. It’s a rushed turnaround.
True, but since when has that sort of pragmatic thinking ever stopped the DfT! The services operated to Redcar for several years until December's Saltburn extension, so it wouldn't be anything new.
Hull definitely isn’t running through to Liverpool, at least not for the majority of the day, in the current timetable.
It may not be running through in practice, but we are talking about the notional timetable here.
Getting rid of Newcastle - Piccadilly only works if Newcastle - Liverpool moves back to the xx:43 path from Newcastle, as it would need to take over the Chester-le-Street calls.
In the traditional railway mindset, perhaps. But the DfT has, for example, instructed Northern to remove the DalesRail service - that will leave Clitheroe-Hellifield without any scheduled service. They honestly couldn't care less about a minor station being reduced to an unusable level of service; it won't stop them from taking a fleet off lease.
Manchester - Glasgow is already only 1tp2h. It’s unlikely to be scrapped as Transport Scotland would kick off at the resultant loss of the daytime Lockerbie - Glasgow link.
Sorry, I meant 1tp4h. Transport Scotland can kick off as much as they want, but unless they're willing to fund the cost of leasing 2 or 3 397s (and possibly even if they are), it won't stop the DfT.