brad465
Veteran Member
The 395s are nowhere near the end of life, being 17 years into service and having just had a mid-life interior refurb. However, there are arguably not enough of them to manage demand, which recently hasn't been helped by the Ramsgate derailment unit repair. I'm not aware of the service's exact profitability, but a HS1 premium charge combined with most services being well-used shows it must be viable and have potential that more capacity would unlock.
Would Southeastern benefit from ordering a new fleet to expand on the existing one and provide a platform for the eventual 395 replacement at end of life? Depending on the timings, a new effective microfleet would be made first to enhance capacity, then a larger follow-up order of the same class would seek to replace the 395s when due.
I was thinking a fleet of high-speed BEMUs might be worth looking at, which use OHLE on HS1 but then off HS1 use battery power and/or third rail, the batteries providing extra power to support third rail (395s on third rail are more sluggish than 375s), which might also allow for higher top speeds on HS1 (and be easier to path around Eurostars). Batteries would also of course allow for the prospect of Hastings' services if the physical connection necessary at Ashford were ever made.
Of course in reality Southeastern are trying to get their metro fleet replacement order through right now, so any HS1 order will not happen until this is sorted, and/or a very strong irresistible business case is produced.
Would Southeastern benefit from ordering a new fleet to expand on the existing one and provide a platform for the eventual 395 replacement at end of life? Depending on the timings, a new effective microfleet would be made first to enhance capacity, then a larger follow-up order of the same class would seek to replace the 395s when due.
I was thinking a fleet of high-speed BEMUs might be worth looking at, which use OHLE on HS1 but then off HS1 use battery power and/or third rail, the batteries providing extra power to support third rail (395s on third rail are more sluggish than 375s), which might also allow for higher top speeds on HS1 (and be easier to path around Eurostars). Batteries would also of course allow for the prospect of Hastings' services if the physical connection necessary at Ashford were ever made.
Of course in reality Southeastern are trying to get their metro fleet replacement order through right now, so any HS1 order will not happen until this is sorted, and/or a very strong irresistible business case is produced.