RailWonderer
Established Member
I think it’s the HSTs and 321s that have made Scotrail insistent on electrification and new rolling stock.
Indeed. And even with a single national fleet strategy as some people are proposing, it would have need to include incentives, or a mandatory compliance mechanism, in order to have any bearing on stock bought outside the franchising system.But even if there were electrified lines wanting extra stock, *this particular* fleet - only five units, non-gangwayed, non-standard, probably needing major overhauls - wouldn't have been likely to be popular with any operators. You can say that they ought to have been specified with future re-use in mind, but why would HAL, 17 years ago, have specified something different from what they wanted, on the off-chance of improving reuseability in 2022?
Well, that and its stated intent in 'transitioning Scotland to a net zero economy.'I think it’s the HSTs and 321s that have made Scotrail insistent on electrification and new rolling stock.
The government in Whitehall is promising that too, just Scotland seems to be more serious about it.Well, that and its stated intent in 'transitioning Scotland to a net zero economy.'
I would hope SR would look at the 350/2’s but it seems more likely that new build stock will be ordered. Ideally the 350/2’s could be added in the Central belt/Ayrshire, with the 380’s and some 385’s moved to solely run on the suburban routes. The 334’s could pick up the Argyle Line in time. Again though new builds seem far more likely which still leaves a question mark against the 350/2’s.Might ScotRail be interested in the 350/2s as "360 ish" to allow retirement of the 318s?
Evidently not the 321s as they wouldn't have gone for HSTs.I think it’s the HSTs and 321s that have made Scotrail insistent on electrification and new rolling stock.
It'll be new stock, SR are already procuring it.I would hope SR would look at the 350/2’s but it seems more likely that new build stock will be ordered. Ideally the 350/2’s could be added in the Central belt/Ayrshire, with the 380’s and some 385’s moved to solely run on the suburban routes. The 334’s could pick up the Argyle Line in time. Again though new builds seem far more likely which still leaves a question mark against the 350/2’s.
The government in Whitehall is promising that too, just Scotland seems to be more serious about it.
In Scotland there is significant progress on the ground, in the form of electrification projects, planning and rolling stock procurement on a level not seen in England. Even if Scotland does miss its target, it won't be missed by muchI believe that the person in charge of Scotland is promising many things as well, whether or not any of them can be delivered is another subject all together
Something many people fail to grasp, is that if they were needed by anyone - they could have leased them from ROG.
Nobody wanted to.
True, but this continues the theme of "nobody has a use for them today so it's fine to scrap them", without asking the question of how that situation had come about. Had Southeastern not found a use for the 707s, would people have been fine for them to all be sent to Newport and shredded, too? Perhaps with the seats still wrapped in plastic!Something many people fail to grasp, is that if they were needed by anyone - they could have leased them from ROG.
Nobody wanted to.
C2C actually looked at these units many years ago before taking on the speculative 387 order that Porterbrook made - it never amounted to anything.
The DfT have never had anything to do with these units though. If they wanted, they could probably have got them for scrap value to store for the future.True, but this continues the theme of "nobody has a use for them today so it's fine to scrap them", without asking the question of how that situation had come about. Had Southeastern not found a use for the 707s, would people have been fine for them to all be sent to Newport and shredded, too? Perhaps with the seats still wrapped in plastic!
The point is that we have a body, the DfT, who insist on meddling, overseeing and micromanaging who is allowed to operate what, and yet despite their tight control of things there is total disarray and always has been. We've gone from having to weld up the rust and fit accessible bogs to near 40 year old Sprinters because they wouldn't allow anyone to buy new DMUs, to now having piles of servicable EMUs in every scrapyard because the industry is buying new stuff like kids buy sweets. Any excuse not to utilise what's already available, we'll have something shiny please. And of course nobody wants to store anything, because it costs money. Just throwing it away because it's cheaper than finding it use is an appalling attitude. It's even been pointed out that just removing the seat frames from these condemned 360s, despite them being industry standard and almost certain to find a use in a future project somewhere, can't happen, because nobody is capable of the logistics of putting them somewhere! It beggars belief.
You can look at a particular fleet, and you can decide that their fate is justified because, in the moment, it makes some sense. But where the industry desperately needs to be going is looking at the bigger picture, the chronic waste really needs to stop. As for the 360s, quite simply the industry should be better set up so that obscure microfleets becoming redundant at the point of mid-life simply doesn't happen. If it's running on our industry metals then it fitting into some sort of competent long term plan should be a condition of it being there!
Indeed, but that's part of the issue. It all comes nicely under the general lack of cohesion!The DfT have never had anything to do with these units though. If they wanted, they could probably have got them for scrap value to store for the future.
I agree their actions on other fleets are crazy, but for this one they never had any authority.
I'm interested in the facts of what is happening but the level of speculative discussion is in danger swamping them. Might a separate thread in the speculative discussion section be appropriate?
204 I believe.Sorry if I’ve missed this but which unit went to Newport today?
Your “input” missed the more important point: we still have 40 year old diesels which are run into the ground roaming the UK rail network. If the government was serious about tackling the climate crisis, they would do something about it…The point is the same: spare EMUs are useless for diesel routes.
Agreed, but in the here and now, even if electrification is authorised now, five 5-car EMUs are of little consequence. It's no use jumping up and down about what did or didn't happen in the past, you can't go back and change it.If the government was serious about tackling the climate crisis, they would do something about it…
Agreed - going back at least as far as BR's Standard steam locos, with around 1000 built, barely any of which reached the age that the 360/2s have. They were followed by various classes of type 1 diesels which similarly were gone within about 15 years, the exception being the class 20s. In both cases, situations and markets changed faster than anyone anticipated.It’s the same old reactionary posts. Given that the industry has a long, a very long history of disposing of locos, units and coaches that failed to reach their 20th birthday why are people still outraged. It’s a library list of traction and rolling stock that was disposed of because there was no further work for it or the work it was built for no longer existed. This is just one item more for that list, it’s not anyones fault just circumstances.
Yes, these 360/2s had an easy life. Ditto the 332s.Difficult to imagine it was particularly intensive compared to a lot of other stock on the network.
quite simply the industry should be better set up so that obscure microfleets becoming redundant at the point of mid-life simply doesn't happen.
It was reported on this forum, at the time of their scrapping, that the Class 332 fleet was in a rather poor mechanical condition...Yes, these 360/2s had an easy life. Ditto the 332s.
I'm going to take a shotgun approach here and say "more than can possibly be justified".Just out of curiosity. How much would it have cost to put connecting doors and 3rd rail equipment on these?
In the 'what's the point?' region...Just out of curiosity. How much would it have cost to put connecting doors and 3rd rail equipment on these?