Any ideas what the latest plans are for Portsmouth? Last I heard Siemens were going to "have another go" at resignalling in May.

Portsmouth Interim Signalling Scheme... nice!

Cheers

Geoff M.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

paul1609

Established Member
Joined
28 Jan 2006
Messages
7,992
Location
K
Understand that they are hoping to make significant progress over the May bank holiday but there is no definate date for commisioning. Siemens trains dont appear to be doing much better a couple of Portsmouth to Waterloo fast trains this afternoon were formed of 4 car 450s. So much for using 450s to provide more seats!
 

paul1609

Established Member
Joined
28 Jan 2006
Messages
7,992
Location
K
Network Rail have today been found in breech of their network license due to the Portsmouth Resignalling. http://www.rail-reg.gov.uk/server/show/ConWebDoc.8741

I understand that the areas rail users groups are threatening legal action against Network Rail and the Train Operators in order to secure compensation for passengers.
 

paul1609

Established Member
Joined
28 Jan 2006
Messages
7,992
Location
K
On the ground there doesnt appear to be anything happening at all.
The service is basically 5 tph to the harbour with the rest turning back at fratton.
Platform 1 is closed at the harbour and 3 and 4 at portsmouth and Ssea (the low level station.
platform 3 at fratton is the down platform with Platform 2 being used for terminating trains.
The main entrance to fratton depot is still out of use with all trains having to enter dapart through Fratton Yard.

The old signalling is chronically unreliable now and the service just tends to collapse for a couple of hours here and there.

Today the new crossing barriers failed at Warblington in the morning peak with only 3 of the barriers coming down. Service was restored by blocking the road with network rail transit vans and then hand signalling trains past the still up barrier!

There is no official date for completion. The temporary service became the permanent timetable at the latest timetable change and the apologising announcements have stopped.

Several local companies are supposed to be seeking compensation from Network Rail for lost business including the ferry companies and local tourist attractions.

In all its a total shambles.
 

Nick W

Established Member
Joined
5 Nov 2005
Messages
1,436
Location
Cambridge
I think Network Rail have already been punished with cost overuns so a fine doesn't seem appropriate.

I wonder if they could admit their mistakes and rapidly install absolute (/intermediate) block throughout that area.
 

class450

New Member
Joined
14 May 2007
Messages
4
Location
cosham
network rail had better do something otherwise they will have me to deal with as well :mad:

i live in cosham and work in southsea and it's a real pain in the ar$e getting there and back everyday :mad:
 

TheSlash

Established Member
Joined
7 Jun 2005
Messages
2,336
Location
Marwell Zoo
network rail had better do something otherwise they will have me to deal with as well :mad:

i live in cosham and work in southsea and it's a real pain in the ar$e getting there and back everyday :mad:
I know who you are ;)
The untold stories i could add to this topic about what is really going on, but i think i'll hold my tonuge on such matters until Chaz is re instated fully and without suppression.
 

Guinness

Established Member
Joined
13 Jun 2005
Messages
3,736
I know who you are ;)
The untold stories i could add to this topic about what is really going on, but i think i'll hold my tonuge on such matters until Chaz is re instated fully and without suppression.

Tongue may return to use 8)
 

paul1609

Established Member
Joined
28 Jan 2006
Messages
7,992
Location
K
I think Network Rail have already been punished with cost overuns so a fine doesn't seem appropriate.

I wonder if they could admit their mistakes and rapidly install absolute (/intermediate) block throughout that area.

i do have some sympathy with this view but i think that network rail should be broken up in to 4? regional companies and fully transferred in to the private sector. I think that network rail was a good interim situation following the railtrack fiasco but its pretty obvious that the network is continuing to deteriorate despite the huge amounts of Government money being sunk in to it and that Network Rail is unable to manage even basic renewal schemes.
--- old post above --- --- new post below ---

From the heading on the press release I assume Siemens have hired Harry Potter to fix their signalling?
 
T

Tom

Guest
i do have some sympathy with this view but i think that network rail should be broken up in to 4? regional companies and fully transferred in to the private sector. I think that network rail was a good interim situation following the railtrack fiasco but its pretty obvious that the network is continuing to deteriorate despite the huge amounts of Government money being sunk in to it and that Network Rail is unable to manage even basic renewal schemes.

Define basic.

I wouldn't say the Portsmouth resignalling project was a simple project. Yes there was previous experience with axle counters following the Bomo installation but the sub contractors were at fault - NR have even stopped using sub contractors for projects such as resignalling.
 

paul1609

Established Member
Joined
28 Jan 2006
Messages
7,992
Location
K
I dont think that network rail has directly managed any sizeable project since its inception. Despite all the hype it frequently has to resort to contractors to carry out even very low level maintenance on secondary lines as it doesnt have the management skills in its own staff.
 
T

Tom

Guest
Ah - but it wasn't directly installed by any of those firms.

It would be a bit OTT to absorb all those firms into Network Rail.
 

paul1609

Established Member
Joined
28 Jan 2006
Messages
7,992
Location
K
Network Rail having announced a definate date of October for commisioning the Portsmouth Area resignalling, there are rumours going around today that this will be deferred until Easter 2008 as there are problems resourcing signalling testers. It really is time the Government started to plan for the break up of Network Rail before its too late!
 

Dennis

Established Member
Joined
8 Aug 2005
Messages
2,676
Location
Trowbridge
Might as well abandon the resignalling, by the time it's finished ERTMS could be on it's way.

BTW, Royal Navy personnell perhaps ought not complain too much about their grub, otherwise a famous telly chef will be parachuted in to sort it out, leaving behind a menu of inedible delights such as olive oil deep fried in goats cheese with a crunchy grape seed coating.
 