The only part left now. I know workers at RPD would walk through it post coal use. Absolutely filthy though!Any volunteers to try using the tunnel that the conveyor used to use?
Based on the utter mess they have made of bus provision in their fiefdom, I would not let them anywhere near anything to do with transport......So are you telling me that if I want to lay over 2km of OO gauge railway in my garden, if it’s a passenger service for a single ant, I need a DCO!
This kind of bad legislation is typical of our useless politicians and government. I would understand it if any houses, homes, businesses etc. were being required to be demolished or their land badly impacted.
But the line we are talking about did have very occasional trains or engineering vehicles on it back before BR was chopped up (the disused section). And under Railtrack/Network Rail, when the new section of line to the docks was put in, all the pointwork for a turnout was provided. Kinda demonstrating that the line towards Portishead was not officially closed. Okay, the railway removed the point soon afterwards (the remaining parts are under the vegetation nearby, I’ve walked past it).
Did anyone ever go through the legal process to formally close the line?
And as said earlier, the vast bulk of the line is in operational use.
So yet more taxpayers money is being wasted, again!
Where’s that Victor Meldrew quote “I don't believe it!”
== Doublepost prevention - post automatically merged: ==
Maybe we should campaign for North Somerset Council to buy Network Rail then!
And no new stations (although one is planned), signalling or rolling stock, just relaying the track.Okehampton didn't need any planning permission/DCO/TWAO etc. It just needed the money
Portishead to Temple Meads via Parson St - not sure whether it’s been determined where they go (if anywhere) after that. Henbury or short workings to Clifton Down would seem possible candidates.Will the Portishead line start at Parson Street, or is a connection with the Severn Beach line around Sea Mills envisaged?
There is no plan to bridge the Avon at Sea Mills or anywhere else. The plan is to connect to the existing line to Portbury, with additional work on that lije.Will the Portishead line start at Parson Street, or is a connection with the Severn Beach line around Sea Mills envisaged?
It was briefly discussed up-thread, but any crossing of the Avon downstream of Bristol would be so expensive that it would kill any cost/benefit analysis stone dead.Will the Portishead line start at Parson Street, or is a connection with the Severn Beach line around Sea Mills envisaged?
Will the Portishead line start at Parson Street, or is a connection with the Severn Beach line around Sea Mills envisaged?
I don't believe the OP was suggesting such a bridge - no-one would do so seriously and it is not even worth discussing, I just think they were unfamilar with Bristol railway geography. For the OP's benefit, and as others have explained, the Portishead scheme is a relatively short extension, from an existing freight branch (to Portishead docks), along an old trackbed to a new station a bit nearer to the town in order to re-instate a passenger service. The site of the original passenger station was further on but is no longer available.any crossing of the Avon downstream of Bristol would be so expensive that it would kill any cost/benefit analysis stone dead.
My earlier (not entirely serious) suggestion was thinking of a tunnel, not a bridge. I am from the area and very familiar with the topography and know how high a bridge would need to be. I think a tunnel could be done but would likely need to start from the south side of the M5 bridge, which would mean a new station for Pill as that would preclude using the existing site.I don't believe the OP was suggesting such a bridge - no-one would do so seriously and it is not even worth discussing, I just think they were unfamilar with Bristol railway geography.
The Portishead scheme is a relatively short extension, from an existing freight branch (to Portishead docks), along an old trackbed to a new station a bit nearer to the town in order to re-instate a passenger service. The site of the original passenger station was further on but is no longer available.
The tidal range in the area is more than 12m, so the riverbed is presumably something like 14-15m below the High Water mark. The existing Severn beach line is a bit above the high water mark, and then you need to add on the clearance for the trains. You therefore are looking at something more than a 20m drop in elevation to get under the river, which at the recommended max gradient of 1:100 is a 2km incline. From Shirehampton to the M5 bridge (the only available space to build a new line on the eastern bank) is about 850m max. The max gradient for passenger only lines can be eased to 1:80, but to achieve that fall in that space is somewhere between 1:45-1:40 grade. The Lickey is 1:37.7, for comparison.My earlier (not entirely serious) suggestion was thinking of a tunnel, not a bridge. I am from the area and very familiar with the topography and know how high a bridge would need to be. I think a tunnel could be done but would likely need to start from the south side of the M5 bridge, which would mean a new station for Pill as that would preclude using the existing site.
A pedant writes, the original site of Portishead station is where the power station was. The station was moved when the power station was built in the 1950s.My earlier (not entirely serious) suggestion was thinking of a tunnel, not a bridge. I am from the area and very familiar with the topography and know how high a bridge would need to be. I think a tunnel could be done but would likely need to start from the south side of the M5 bridge, which would mean a new station for Pill as that would preclude using the existing site.
The original site of Portishead station is taken be a petrol station, for a long time it used the actual station building but this was demolished around 30 years ago. A site was reserved for a station just behind this (next to where the Waitrose carpark is now) which would still be very close to the high street and a reasonable walking distance from the lake grounds and sea front.
Unfortunately in the late 2000s a road was built across the trackbed south of the town to provide access to a new housing development on former industrial land in the docks area. The rails were literally cut with track left on either side. The developer was supposed to provide funding for a level crossing but this wasn‘t needed immediately so wasn’t installed. The developer (or rather the company they established just for this development) then went bust as a result of the 2008 crash, and the crossing was never installed. In the intervening years NR decided that new level crossings could only be built in exceptional circumstance, so the line has to stop where it was cut (or rather slightly further north with the road diverted). This means that the station is poorly suited for people wanting to visit the town, with long walks to shopping areas and the sea front, though will likely be fine for outbound commuters.
Indeed, and the 1954 station was quite impressive for its day: a stone-faced main building with a concrete canopy at the entrance to the ticket hall, a generous forecourt, and an island platform 780 ft long with a generous (6 carriage?) concrete canopy, complete with skylights.A pedant writes, the original site of Portishead station is where the power station was. The station was moved when the power station was built in the 1950s.
You are of course correct! The original station seemed to have been located for sailings from the port rather than the town.A pedant writes, the original site of Portishead station is where the power station was. The station was moved when the power station was built in the 1950s.
Not at all. Almost all cargo goes to Avonmouth or Portbury, as the Avon is not suitable for large container ships.How busy is the River Avon for shipping?
About the only thing of significant size I see going up and down is the replica of the Matthew, which has quite a tall mast. They get the odd tall ship in too. No commercial traffic, but any crossing would still need to accommodate leisure craft with masts so a bridge crossing would be impractical.NR How busy is the River Avon for shipping?
I think it’s been suitably dismissed as an option in this thread, so as the person floating the idea earlier on I’d vote no.Should we open a speculative thread for Portishead via Shirehampton?
Is there a timescale on Portishead reopening?
see my post #226 on the thread ' projects you would build but probably will never happen'Should we open a speculative thread for Portishead via Shirehampton?
The trouble with the Severn Beach line is the route it takes from Sea Mills onwards.. now if it could continue along the old port and pier route right up to the suspension bridge and then somehow route across to the old Harbour lines.. but then you could say same with Portishead route.. it could have done that too if they've not seen the possibility of that use of line.. unfortunately the line is built on after St Mary Redcliffe tunnel.Should we open a speculative thread for Portishead via Shirehampton?
This is also a useful resource:There has been lots of vague dates to nearest year, Portishead was phase 1 of Metrowest in Bristol, which were originally targeted for 2021, but slipped to June 2023
The line, with Portishead and Pill stations, now appears on some Metrowest maps (the current ones online) as phase 1b
The latest appears to be same time as branch to Henbury opens as part of Metrowest phase 2 which is late 2024 (presumably December timetable change).
Metrowest phase 2 were supposed to all be open by end of 2024, But parts could easily be delayed again.
Sorry to be vague, but the dates seem to be an elastic target rather than anything specific
Ah, the old WC&PLR!Quite happy to discuss Clevedon via Portishead though
Postishead - (river) - Portway P&R - Shire - Sea Mills - Portway Suspension Bridge - (river) - Ashton Gate - Parson St, anyoneThe trouble with the Severn Beach line is the route it takes from Sea Mills onwards.. now if it could continue along the old port and pier route right up to the suspension bridge and then somehow route across to the old Harbour lines.. but then you could say same with Portishead route.. it could have done that too if they've not seen the possibility of that use of line.. unfortunately the line is built on after St Mary Redcliffe tunnel.
On the face of it the vast majority of the trackbed/route from Portishead to the edge of Clevedon is pretty much untouched, you can still see some of it by Clevedon School. It's from there that it gets complicated without bulldozing through a shed load of residential. The route from outside of Clevedon to Yatton is pretty much still there from Kenn to within 1/2 mile of Yatton station. Its quite surprising looking on google maps satellite view that you can see the old route right into centre of Clevedon where station was.Ah, the old WC&PLR!
Yes, twenty years ago.Is there a timescale on Portishead reopening?
That's what I thought. You could have a swing bridge neat to the BMF ground into Pill that would have to open once in a blue moon.Not at all. Almost all cargo goes to Avonmouth or Portbury, as the Avon is not suitable for large container ships.
Leisure craft still go in to Bristol but the tidal Avon is hardly bustling with ships.
That's a big chunk of cash for the railway to spend on a leisure activity, and it would be the railway that is responsible for maintaining a swing bridge in openable condition. And what would be the benefits be for rail passengers over using the existing line to Temple Meads?That's what I thought. You could have a swing bridge neat to the BMF ground into Pill that would have to open once in a blue moon.
Not that it comes remotely close to justifying a new bridge, but I bet quite a few Portishead passengers would benefit from the much quicker connection to Clifton Down, which is equally or better located than Temple Meads for a fair chunk of employment in Bristol.That's a big chunk of cash for the railway to spend on a leisure activity, and it would be the railway that is responsible for maintaining a swing bridge in openable condition. And what would be the benefits be for rail passengers over using the existing line to Temple Meads?