First, nothing is impossible. Lots of things in the past have been described as impossible, only to be made possible at a later date.The existing line is single track and winding and slow, it will never permit a decent frequency to be run. It would be essentially impossible to double it, without a new tunnel
Secondly, significant parts of the route were previously double track.
And thirdly, there is already some double track.
Starting at Parson Street Junction, we have a single lead junction, which becomes double track. Near the former footpath at Ashton Containers crossing (end of Barons Close) the line becomes a single line. However, the route is wide enough for double track, which is what it was before Ashton Junction signal box closed.
The route continues over Ashton level crossing (Ashton Vale Road). Through the former site of Ashton Gate station. And on to the former site of Clifton Bridge station. All the route so far is wide enough for double line.
Beyond Clifton Bridge station, the line was built only as a single line. primarily because of the tunnels.
At Pill, the route is again wide enough for double line. If wanted, it could be double line from Pill all the way to Portishead.
There is a possibility of a passing loop in the section between two of the single line tunnels.
The line was originally built to Brunel’s broad gauge. The existing freight line speed limits may be able to be raised for passenger trains. Of course, this may involve some extra engineering work, so there may be additional costs for this.
But overall, if the investment was made, a very decent train service could be provided.
One of the problems that previously limited the number of passenger trains, was the need to honour the train paths that the freight company has. But with the end of the coal traffic, and only occasional freight trains, I’m sure that there could be a new negotiation about this.
== Doublepost prevention - post automatically merged: ==
From Nailsea & Blackwell to Bath Spa in 2021-22 there were just under 11,000 journeys, or just over 7%. From Yatton to Bath Spa it's even smaller, under 9,000 per year and just over 5%.
It’s Nailsea & Backwell not Nailsea & Blackwell.
Bristol does need a tunnelled metro. But strangely enough, no one knows where to find the massive amount of money needed for such a project…