A good video, nice to get an inside view of the various compounds. A few corrections however:
* It’s called the Avonmouth Bridge, not ‘Gordano Viaduct’. Not sure where that name came from!
* Early in the video the presenter says the line to Portishead was disused and lifted - it’s only been lifted now as part of the rebuilding (this is stated later in the video)
* He says the points at Portbury Junction were removed - the points were never installed in the early 2000s, but were actually delivered to site with parts left in the cess and plain line through to the docks.
* The site engineer at the main compound says the Portishead end of the line was decommissioned in the 1960s. Freight actually ran up until 1981 and special trains ran for the GWR 150 celebrations in 1985. Not sure when maintenance trains stopped running but I saw at least one later in the 1980s. The section under the M5 up towards Portbury was relaid with CWR and concrete sleepers in the late 70s not long before freight stopped (this might be the track sent to the Avon Valley as it would have barely been used!)
* Whitebeam trees don’t only grow in the gorge, we have one at work! Though they are ‘native’ to the gorge.
* I’d hesitate to call it a ‘frequent commuter service’ at one train per hour! Hopefully that will be improved on in time.
It might also have been fair to point out that the DCO (which accounts for a lot of the cost) was only necessary because the local authority bought the tracked from BR to protect it from development, but in doing so lost the grandfather rights that went with the railway - had they not done this the DCO wouldn’t have been needed and we might have been a bit further along by now! I’ve also heard it stated that they would only have needed the DCO from Portbury Jn but applied for the whole line, including the section through various designated nature sites in the gorge, which increased cost and complexity.