tumbles
Member
I suspect the passenger service if only hourly or thereabouts will not result in significantly more disruption compared to when the line was being used at maximum capacity for long freight trains (a mix of car trains and coal trains). The long freight trains took a while to pass over the crossing (especially fully loaded trains) because every single one had to stop so that the driver could collect a token or replace a token at the relevant signal (one token hut at the protecting signal either side of the level crossing). Hence the train was always pulling away from a stand...
With the removal of the token instruments (replaced with TCB but with axle counters), two or three car DMUs will take far less time to pass over the crossing (having no need to stop) therefore the road closed time will be significantly less per train.
Agreed. The traffic lights on that crossroads probably causes longer waits. Another entrance into the industrial estate will probably cure lot of the problems as discussed.
On other news passed over the RPD road and no significant progress on clearing and old track still in place between the bridge and Portbury station. Guess they might pick up the pace after the weekend