Northern aren’t trained to use or maintain it and it makes the Class B (TPWS) systems worse in terms of human factors.Is there any point of removing it?
Oh, and the cab is completely different
Northern aren’t trained to use or maintain it and it makes the Class B (TPWS) systems worse in terms of human factors.Is there any point of removing it?
An accountant at Porterbrook thought they could milk them for another 10 years or so by making then bi-mode without really understanding one does not simply strap a diesel enging onto 30 year life expired frame and components. The Northern 319s were becoming increasingly unreliable which should have served as warning. It's disappointing as clearly a lot of time and effort has been made to convert but new bi-mode train order to replace these cannot come quick enough.By the looks of it the 769s are currently an absolute joke... I'm not a Northerner but at this rate surely it would make more sense to start from scratch and place an order for completely new units, possibly bi/tri-mode Civities? That's assuming the funding can be secured.
I find it very silly they decided to pour money into attempting to make a fleet of 35 year old units that have been heavily used for busy commuter services, bi/tri-mode. To me it almost seems like they were asking for it.
And that accountant deserves a very large bonus + a promotion. Porterbrook are doing very nicely out of the 769 farce. It is Northern's passengers and the tax payer who are getting screwed.An accountant at Porterbrook thought they could milk them for another 10 years or so by making then bi-mode without really understanding one does not simply strap a diesel enging onto 30 year life expired frame and components.
5Q11/12 (at least) cancelled.769452 on 5Q11 Crewe EMD-Crewe-Lancaster last night got as far as Crewe station and retired hurt. Tonight/early tomorrow there are 5Q11-15 booked which are Crewe-Lancaster-Crewe-Warrington BQ-Crewe-Allerton which is presumably another 769452 attempt.
Today 4 started the day, although currently 3 are moving (31/42/58) with 34 at Wigan Wallgate due to crew problems. 21 is at SP, 56 at Brodies, 24/48/50 are not in use and 52 waiting test run.
It is a shame when you think about the workers doing this - but ultimately all that effort was kind of worthless, and I think everyone with even the slighest knowledge of the 319s' history foresaw that before they even began.It's disappointing as clearly a lot of time and effort has been made to convert
How exactly?it makes the Class B (TPWS) systems worse in terms of human factors
That is a good point to be fair - but I don't think it's necessarily for the worse.Oh, and the cab is completely different
The trains are owned by Porterbrook and leased to Northern.I would be surprised if the lease agreement doesn't place any penalty on Porterbrook when they aren't available for service.* Maybe Northern prefer this arrangement where they get 'cash back' when the trains fail to deliver, - it would help their funds.Agree. I feel sorry for regular passengers on this route. A quick look on RTT sees just 4 in use today. Only 3 or 4 in use yesterday I believe too. With 10 in the Northern fleet Northern Rail must be getting poor value as I presume they pay leasing charges whether their in use or not?
I think its fairly obvious they expect the trains ' fail to deliver' if there's a rescue or thunderbird or whatever contingency sat at Wigan. But it is what it is so you just carry on till the end of the contract ( or the sky falls on your head)The trains are owned by Porterbrook and leased to Northern.I would be surprised if the lease agreement doesn't place any penalty on Porterbrook when they aren't available for service.* Maybe Northern prefer this arrangement where they get 'cash back' when the trains fail to deliver, - it would help their funds.
* Unless there is clear evidence that Northern were not servicing them appropriately.
They were only ever a stop gap to allow electric running under the wires where routes included lines that were being incrementally wired. It's unfortunate that their reliability is poor as when running properly, they are cleaner, quieter and ride better than the dreaded class 150s. I remember many predictions here that their acceleration was inadequate to use on services scheduled for Sprinters. Despite having a lower installed power to weight ratio, the electric transmission is more efficient, and provides a better torque curve.I think its fairly obvious they expect the trains ' fail to deliver' if there's a rescue or thunderbird or whatever contingency sat at Wigan. But it is what it is so you just carry on till the end of the contract ( or the sky falls on your head)
Both the availability and reliability of the 150s are better than 769s. Clearly the 769s are making money for Porterbrook because they wouldn't bother doing the current round of overhauls. Not so great for the Southport line which will continue to suffer from disruption for another five years.They were only ever a stop gap to allow electric running under the wires where routes included lines that were being incrementally wired. It's unfortunate that their reliability is poor as when running properly, they are cleaner, quieter and ride better than the dreaded class 150s. I remember many predictions here that their acceleration was inadequate to use on services scheduled for Sprinters. Despite having a lower installed power to weight ratio, the electric transmission is more efficient, and provides a better torque curve.
.
No rescue or contingency sat at Wigan. Now back in the 70/80's you could just have a choice of 20/25/31/37/40/47/50/56..........from a 'proper' diesel depot that could couple up (and had staff....). Now if there are only 2 769's in use and one fails, the 'fit' one has to be stopped as its either gone to rescue or isn't allowed out on its own.I think its fairly obvious they expect the trains ' fail to deliver' if there's a rescue or thunderbird or whatever contingency sat at Wigan. But it is what it is so you just carry on till the end of the contract ( or the sky falls on your head)
Sorry my bad. Saw the red livery one parked up when I went past the other day and jumped to conclusions.No rescue or contingency sat at Wigan. Now back in the 70/80's you could just have a choice of 20/25/31/37/40/47/50/56..........from a 'proper' diesel depot that could couple up (and had staff....). Now if there are only 2 769's in use and one fails, the 'fit' one has to be stopped as its either gone to rescue or isn't allowed out on its own.
If (when) there's a failure the usual trick is to cancel a return Southport-Man Ox Rd/Stalybridge whilst its worked out which 4 car DMU -already out as replacement can be split into 2's - problem then is that most of these replacements are already short-formed.
Whilst today looked reasonable, with 5 (booked 6) starting the day, 769431 failed at Wigan early, whilst 769434 has been stopped, picking up diagram later today. Too be fair, though, Network Rail have got in on the act with signalling problems in the area.
Thats 769421, one of the 2 ex-TfW units which has run for 2 days and failed on both occasions. Now sat at Springs Branch with one power pack apparently isolated and being used as a training unit. The other unit 769452 hasn't yet made even a test run. Am advised that all driver links at Man Vic are now being trained on the 769's which does not bode well for the Southport line for the next xx years, let alone the poor sods wherever else they are let loose..........ex-GWR units, Man-Huddersfield stoppers??Sorry my bad. Saw the red livery one parked up when I went past the other day and jumped to conclusions.
Still going, though!!Just 434 and 450 have started out today. Not very encouraging!
So they are training all Man Vic links on 769s in the hope that anywhere between five and two units actually survive the day in traffic. Astonishing.Just 434 and 450 have started out today. Not very encouraging!
I don't think they have enough fuel range using pure diesel mode to meet the diagrams.So I would have thought they would have left the visits to Crewe ETD for pantograph fitment and just put them in traffic as DEMUs like TfW used them. Obviously they would be slower on diesel power, but at least the 769s would present themselves for traffic more frequently with less overall cancellations.
I suppose that is as good a reason as any, but how many miles did the TfW ones run per diagram ? Admittedly downhill from Rhymney but thery probably wouldn't idle like a conventional DMU would they !!!I don't think they have enough fuel range using pure diesel mode to meet the diagrams.
Why wouldn't they idle. The hotel and auxiliary load on the diesel prime energy sources would be similar for both types.I suppose that is as good a reason as any, but how many miles did the TfW ones run per diagram ? Admittedly downhill from Rhymney but thery probably wouldn't idle like a conventional DMU would they !!!
Never been on one but I have heard videos and seen people mention that engine rpm sometimes increases without any movement. I sense this is because the diesel engines are effectively gen sets to replace the 25kV feed to the transformer, rather than provide traction current to the traction motors.Why wouldn't they idle. The hotel and auxiliary load on the diesel prime energy sources would be similar for both types.
The engines sustain the 750VDC line directly. Assuming that the auxiliaries and hotel loads are fed from that line, (the transformer plays no part in 3rd rail operation), when there's no traction motor demand the engine on tickover would probably provide enough power for them, much as it would on a conventional DMU.Never been on one but I have heard videos and seen people mention that engine rpm sometimes increases without any movement. I sense this is because the diesel engines are effectively gen sets to replace the 25kV feed to the transformer, rather than provide traction current to the traction motors.
When there's no traction demand, the diesel engine/alternator sets needs to provide enough voltage (not power, as such) to feed the unit's auxiliaries - MA set for battery charging, main compressor, plus saloon heating in winter, at least. This voltage needs to be 400 V at least, to match what would be the minimum in third rail operation.The engines sustain the 750VDC line directly. Assuming that the auxiliaries and hotel loads are fed from that line, (the transformer plays no part in 3rd rail operation), when there's no traction motor demand the engine on tickover would probably provide enough power for them, much as it would on a conventional DMU.
Except that's not how variable excitation alternators work.When there's no traction demand, the diesel engine/alternator sets needs to provide enough voltage (not power, as such) to feed the unit's auxiliaries - MA set for battery charging, main compressor, plus saloon heating in winter, at least. This voltage needs to be 400 V at least, to match what would be the minimum in third rail operation.
What the engine speed needs to be to get that voltage I don't know, but it will depend on the excitation characteristics of the alternator. For a given engine speed, the more voltage you want out of the alternator the more excitation current you need; and there will be limits on that.
That's the sort of operation you always get on a diesel-electric unit such as a 22X: even when stationary the engines have to be running 'quite fast' to power all the auxiliary loads - in the case of 22X there's the air con to feed, not something 769s need to worry about....
Kindly explain how they do work then.Except that's not how variable excitation alternators work.
This could get interesting Paul.Kindly explain how they do work then.
You don't need to rev the nuts off your car to charge the battery, and haven't needed to for quite some time now.Kindly explain how they do work then.
I remember at my last job, we had a newish Mercedes minibus, a Sprinter van with a posh body built on it in a way and everytime you fired it up, even from stone cold, it would rev the knackers off straight away by itself. Never found out if it was faulty or not but it made me wince everytime as it couldn't have been doing the engine any good!You don't need to rev the nuts off your car to charge the battery, and haven't needed to for quite some time now.
Same means, larger scale.
If you'd like to know more, I'd suggest reading a book before trying to sound so confidently and authoritatively wrong.
Can we take it that you're not prepared to tell us how variable excitation alternators work, then?You don't need to rev the nuts off your car to charge the battery, and haven't needed to for quite some time now.
Same means, larger scale.
If you'd like to know more, I'd suggest reading a book before trying to sound so confidently and authoritatively wrong.
When there is no call for traction power, the MA only needs to provide the same or similar levels of power as with a DMU, which also have needs for "battery charging, main compressor, plus saloon heating in winter, at least". So how does a DMU satisfy such demands? They don't need 400V. A coasting or stationary 769 does not need 400V either, the traction control system monitors the MA voltage, and when the driver demands power that demand results in the diesel engine raising it's speed and the MA excitation so that the MA output voltage and current increases, matching the demand in a closed loop control system.When there's no traction demand, the diesel engine/alternator sets needs to provide enough voltage (not power, as such) to feed the unit's auxiliaries - MA set for battery charging, main compressor, plus saloon heating in winter, at least. This voltage needs to be 400 V at least, to match what would be the minimum in third rail operation.
What the engine speed needs to be to get that voltage I don't know, but it will depend on the excitation characteristics of the alternator. For a given engine speed, the more voltage you want out of the alternator the more excitation current you need; and there will be limits on that.
That's the sort of operation you always get on a diesel-electric unit such as a 22X: even when stationary the engines have to be running 'quite fast' to power all the auxiliary loads - in the case of 22X there's the air con to feed, not something 769s need to worry about....
You might be confusing my reference to MA set (Motor Alternator set) with the main traction alternators as directly powered by the diesel engines.When there is no call for traction power, the MA only needs to provide the same or similar levels of power as with a DMU, which also have needs for "battery charging, main compressor, plus saloon heating in winter, at least". So how does a DMU satisfy such demands? They don't need 400V. A coasting or stationary 769 does not need 400V either, the traction control system monitors the MA voltage, and when the driver demands power that demand results in the diesel engine raising it's speed and the MA excitation so that the MA output voltage and current increases, matching the demand in a closed loop control system.
The fact that the DC bus is a nominal 750V in normal 3rd rail service doesn't matter. Assuming the 769s use the 319s traction control, the DC is chopped up to provide the correct current/voltage for demand and speed. This is the equivalent of switching in series resistors to prevent excessive current at low speeds on traditional DC motors with an LV supply.