Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!
Why are the platform humps on all the lines apart from the met line about 3 cm below the floor of the train? (On the met line they are level with the floor of the train).
The humps cost around a million pounds each and can be completed in a short shut-down. Things on the platform need to be modified such as benches, and there are other platforms with low ceilings preventing this.
Even ignoring the cost and the time, only small parts of the train are accessible for wheelchairs.
We are aware of an issue with emails from the Forum to Microsoft-based email accounts (hotmail/outlook/live.com email addresses). This is being looked into currently, thanks for your patience meanwhile.