Is that so?
There are a lot of reasons why platforms aren't easily extended - usually there's always something in the way. Junctions immediately adjacent platform ends, level crossings near by, signal post at the end of platform, OLE mast, cabinets galore, a bridge, a tunnel. It's pretty rare for an "easy win".
How much longer would you make a platform? Train unit configuration should be considered - 1 carriage length longer? 2? 4?
There'll be a bit of "chicken and egg" situation with platform extensions. Do you provide a platform that is overly long for today's needs which won't realise its potential until the trains are lengthened (Could be 20-30 years waiting for a renewal of the rolling stock) or do you have overly long trains with a temporary inconvenience of selective door opening before lengthening platforms?
In a perfect world the chicken and egg would come at the same time.