I'd like to ask, in conjunction with the new stock being procured for ScotRail, and with the average/peak carriages increasing to 6/8 from 2-3/6 (e.g. Edinburgh - Leven/Dundee).

What would the logistics, challenges and other existing factors associated with raising/lowering or extending the length of an existing platform to accommodate these new trains? And where might this be necessary in Scotland after the new stock is introduced?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

waverley47

Member
Joined
17 Apr 2015
Messages
838
I can say that there won't be 8x23m services from Edinburgh to Fife associated with this batch of units. It would involve lengthening platforms across the route, to an enormously expensive degree, some of which would be very, very difficult to extend; North Queensferry springs to mind.

Currently, services can run with any combination of between two and six carriages, however the fleet strength means that there's a tendency towards the lower end of that on many services. The new fleet will consist of longer units, however this will still max out at around the 6x23m standard. This will help soak up capacity on some shorter services, and standardise fleet length somewhat.

I may need to check, but I am almost certain that every platform in Fife and beyond can platform 6x23m, with the possible exception of Springfield. Certainly all stations to Tweedbank, and basically everything in the Central Belt is long enough.

From memory, the only stations served by anything longer than 6x23m are, and will continue to be, Inverkeithing, Kirkcaldy and Leuchars. I can't remember their operational lengths, and although the cost of lengthening to platform a full ten car 80X combination would fall on Transport Scotland, they will be unwilling to do something for the purposes of four LNER services in each direction per day.

So the answer to your question: "where would platforms need to be extended," should be zero, however the odd platform might need a little extension.

For the answer to "what logistically is involved in such," then unfortunately you'll need to wait on someone who's worked with the civils departments; I'm not qualified to build them, just to point at where they need to be built.
 

TrainViation

Member
Joined
25 Jun 2025
Messages
292
Location
Glenrothes
Kirkcaldy station can accommodate 9-car LNER Azumas, Inverkeithing can’t however but LNER just uses the “short platform, move forward to alight” announcement. And I’m not too sure about Leuchars, but I think it can take 9-10 coaches.

The only other station I can think of accurately is Markinch, which can take a maximum of 6-car trains, and even at that a double 170 service fills the platform completely. Most other stations on the Fife line can take between 4 and 6 coaches.

I’m not sure how long ScotRail’s peak Inter7City services will be when they get their new trains, but I’m hoping it’ll be longer than 6 coaches (between 7 and 10).

Depending on the available space at the end of a platform, I wouldn’t have thought it would’ve been too expensive to do, minus possible line closures and resource costs. A station like Markinch could be easily extended, as its flat on both sides, with a simple grass patch to the south end of both platforms.

I do however hope that this 6 car commuter length will be the norm, and the 2-3 car peak services and even services at all will be a thing of the past!
 