Anyone know what platform "DML" could mean as stated on Live Departure Boards this evening? - as shown on the attachment
 

Attachments

  • ldb.jpg
    ldb.jpg
    85.5 KB · Views: 82
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Daniel

Established Member
Joined
5 Oct 2005
Messages
2,565
Location
London
It may mean "Down Main Line"?

Possibly they're non-stopping the train due to late-running?

Edit: Pipped to the post by TheExmoorBeast ;)
 

yorkie

Forum Staff
Staff Member
Administrator
Joined
6 Jun 2005
Messages
78,253
Location
Yorkshire
It must be Down Main Loop (Platform 2). The centre roads do not have platforms. Platform 3 is a bay so cannot be used.

So it must be platform 2.
 

ralphchadkirk

Established Member
Joined
20 Oct 2008
Messages
5,754
Location
Essex
It could be Down Main Line - but not showing as a platform because it is not stopping? Just a guess though.
 

ralphchadkirk

Established Member
Joined
20 Oct 2008
Messages
5,754
Location
Essex
It's showing on CCL as on p2. So you were right in that respect Yorkie - however I don't think it would be Down Main Loop.
 
Joined
12 Feb 2010
Messages
441
Location
Taunton
I would disagree with you (after getting his trusty Quails out of the drawer) the platforms at Wellington are on loops.
 

splitfare

Member
Joined
6 Jul 2009
Messages
32
Platform 2 is on the Down Main Loop but what is the significance (if any) of stating "DML" in preference to Platform 2 - the next train in the same direction states "2".

The service appears to have stopped at Wellington as stations further along the route are now showing an actual departure time for Wellington on LDB.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,658
DML in planning would mean Down Main Line. Its perfectly possible for someone to have ballsed up and put DML instead of the correct platform in the schedule.
 

ralphchadkirk

Established Member
Joined
20 Oct 2008
Messages
5,754
Location
Essex
Why would it be Down main loop then, if there is only one loop then there can't be another, so if it was described as a loop (which I'm not entirely sure it is) then surely it would be just the down loop?

EDIT: Thanks "The Planner", confirms my suspicions were correct!
 
Joined
12 Feb 2010
Messages
441
Location
Taunton
Actually I've cross referenced it & got confused (but that's probably the effects of he cider I'm drinking!) and now found it and it is Down Platform Line.
 

Dreadnought

Member
Joined
1 Oct 2007
Messages
586
I remember Rugby departure screens showing a late evening Virgin service to Manchester as stopping on the DFL.

Interestingly I have seen this tried on a couple of times! First time the train was set back to cross on the points at the south end to access P2 and on the other occasion it went forward down the Coventry line before reversing back into P1!
 

splitfare

Member
Joined
6 Jul 2009
Messages
32
The Wrexham and Shropshire service calling at Wellington in the next half hour showed "DML" as the platform again...... and then changed to 2 at the specified arrival time
 