Kath123
On Moderation
The train planners decide which platform the trains use. Control or the Signaller can change it on an ad-hoc basis, or station staff can request it.
The change can be made just for you if it doesn't clash with another train. Platform changes are regularly made at stations for wheelchair users, for example, when lifts are out of action
Thank you for this information - very useful and much appreciated.
Thank you very much for this info. It has helped me to understand a bit more. Unfortunately I am not likely to be using the station late evenings.For southbound trains to use P1 there is approach-control signalling (with a time penalty on paper) which means that during the daytime, there isn’t quite enough time in the timetable to allow services to do this, without impacting the very tight cross at Maiden Newton. if you caught one of the late evening southbound services it probably wasn’t booked to cross anything so there is time.
Hi there is a crossing at Yeovil Pen Mill (I’ve been guided across it a few times in the past few weeks) but generally in my situation I’m escorted over the footbridge. The crossing doesn’t seem to be used much and I’ve been told by one member of staff it isn’t supposed to be used by passengers (not sure why?) but I’m confused about this as sometimes when I tell guards I’m worried about the footbridge they re-assure me by mentioning the crossing.Some of these could be last minute changes due to there being no barrow crossing at Pen Mill - if there's a passenger who can't use the footbridge then platform 1 has to be used