• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Platform 5 and Platform 6 at Queens Park station.

Status
Not open for further replies.

stadler

Established Member
Joined
5 Jun 2023
Messages
3,304
Location
Horsley
When was the last time that Platform 5 and Platform 6 at Queens Park had trains booked to call there? So in other words the last time that either SL or LM or LNWR had booked calls? Can anyone remember more exactly?

I am sure i remember that there used to be some early morning and late evening services. Definitely back in the 2000s and maybe even in to the 2010s as well. I presume these were booked services.

Also does anyone know what is the status and condition of the platforms at the moment? Are they still usable and can trains still call there if necessary? If so then have trains ever called during disruption or engineering work in recent years?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

norbitonflyer

Established Member
Joined
24 Mar 2020
Messages
5,765
Location
SW London
I seem to recall there was a plan to run an open access service from those platforms, getting round the capacity issues at Euston. Can't recall the details, but it all came to naught anyway.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,700
I seem to recall there was a plan to run an open access service from those platforms, getting round the capacity issues at Euston. Can't recall the details, but it all came to naught anyway.
That was another Grand Union proposal, didn't work at Euston so was a fudge and used Queens Park.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,585
Location
Northampton
Also does anyone know what is the status and condition of the platforms at the moment? Are they still usable and can trains still call there if necessary? If so then have trains ever called during disruption or engineering work in recent years?
They're not shown as out of use in the sectional appendix but I don't think anything has called there in recent times (although somebody will now find an exception). I don't know if it's listed as Out of Use in a different non-public document though.
 

Ashley Hill

Established Member
Joined
8 Dec 2019
Messages
5,632
Location
The West Country
The last time I passed platform six it looked remarkably derelict at the country end. I understand remedial work has been carried out to rectify this.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,585
Location
Northampton
The last time I passed platform six it looked remarkably derelict at the country end. I understand remedial work has been carried out to rectify this.
Given the prospect of anything using them is so low, I'm slightly surprised NR carried out work rather than just pursue the Network Change to formally take them out.
 

Ashley Hill

Established Member
Joined
8 Dec 2019
Messages
5,632
Location
The West Country
Given the prospect of anything using them is so low, I'm slightly surprised NR carried out work rather than just pursue the Network Change to formally take them out.
There is a local instruction in the Sectional Appendix referring to the evacuation of trains in the Queens Park area. De-trained passengers must be escorted to that station so presumably the platforms must be kept in a useable condition.
 

pdeaves

Established Member
Joined
14 Sep 2014
Messages
5,932
Location
Gateway to the South West
No companies other than the Overground operator have access rights to the station (not even 'barely or never used' rights). That doesn't affect emergency use but does indicate that there have been no booked calls since goodness knows when, and no intention to start any. The last non-Overground right was for West Coast diversionary use, which expired in 2019.
 

cle

Established Member
Joined
17 Nov 2010
Messages
5,648
I do remember there being 2tph for a couple of years - one to Milton Keynes and one to Watford (short turn). I lived there at the time and it was a very nice quick run out of Euston.

I suspect it would be far better used today (also for Bakerloo railheadding) - but equally, harder to path. And DC is 4tph now.

They did replace the footbridge a few years back. Ultimately, it's only 8 car length so couldn't be in regular rotation I suspect.
 

Dr_Paul

Established Member
Joined
3 Sep 2013
Messages
1,546
I went through Queen's Park last Friday, and the platforms looked a bit tatty and weed-ridden.
 

cle

Established Member
Joined
17 Nov 2010
Messages
5,648
Post HS2 possibility? Would be good to see it get used.
Also a timeframe where the Lewisham/Hayes extension might be done, and the Bakerloo has more frequency and new trains - slightly quicker too.

For many journeys, it'd be quicker than changing for the tube at Euston. And you can get a seat on a starter...
 

jamieh27

Member
Joined
2 Jan 2023
Messages
662
Location
Falmouth
When was the last time that Platform 5 and Platform 6 at Queens Park had trains booked to call there? So in other words the last time that either SL or LM or LNWR had booked calls? Can anyone remember more exactly?

I am sure i remember that there used to be some early morning and late evening services. Definitely back in the 2000s and maybe even in to the 2010s as well. I presume these were booked services.

Also does anyone know what is the status and condition of the platforms at the moment? Are they still usable and can trains still call there if necessary? If so then have trains ever called during disruption or engineering work in recent years?
I have seen photos of P5 and 6 Queen's Park and its stuck in a time warp still has Silverlink signs, green pain and TV CRT screens. Do any train's pass through there I don't know if its the fast line or a spare line for diversions.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,585
Location
Northampton
I have seen photos of P5 and 6 Queen's Park and its stuck in a time warp still has Silverlink signs, green pain and TV CRT screens. Do any train's pass through there I don't know if its the fast line or a spare line for diversions.
Platforms 5 and 6 at Queen's Park are on the West Coast Main Line Up Slow & Down Slow respectively, and are not regularly stopped at by any trains but will be passed through by trains to/from Euston and freights to/from Primrose Hill. There are no platforms on the Fast Lines.
 

jamieh27

Member
Joined
2 Jan 2023
Messages
662
Location
Falmouth
Any idea if there are any stations that still use TV CRT screens for announcements, Or is queen's park the last to have them.
Well technically Maryland Platform 2 has it although it has a flat screen on it. Waterloo East maybe I know they have the old TFT screens too.
 
Status
Not open for further replies.

Top