• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Platform 3 at Grantham?!

Status
Not open for further replies.

tram21

Established Member
Joined
29 Dec 2022
Messages
1,308
Location
Nottingham
I was on a (170) train from Nottingham to Skegness today and it arrived into Platform 3 at Grantham- something that is unheard of!

There didn't seem to be any reason for this, trains were using platform 4 as usual and there was no congestion through the station for once!

Is platform 3 now open for use again on a more regular basis? Recently there's been heavy congestion and EMR trains still have only been using platform 4, causing further delays.

Photo for proof :lol: (photo shows an EMR class 170 in platform 3 at Grantham)
20260108_122136.jpg
 
Last edited by a moderator:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,312
Location
Yorks
I changed at Grantham over the festive period, and there were a lot of delays caused by everything reversing in and out of 4. Great news that 3 is in action.
 

XCTurbostar

Established Member
Joined
13 Sep 2014
Messages
2,484
Is there an operational reason the left platform cannot be used in addition to the right?
 

Nottingham59

Established Member
Joined
10 Dec 2019
Messages
3,330
Location
Nottingham
Is platform 3 now open for use again on a more regular basis?
There is a line of white barriers along the rear edge of platform 2, which would reduce the risk of LNER passengers falling onto the tracks of platform 3. Are these new? If so, might they be the reason they're using P3 again?
 

LowLevel

Established Member
Joined
26 Oct 2013
Messages
8,903
It's not shut and hasn't been, but is restricted to 2 car trains except in an emergency and until December most Skegness services were booked as 3 cars.
 

tram21

Established Member
Joined
29 Dec 2022
Messages
1,308
Location
Nottingham
Is there an operational reason the left platform cannot be used in addition to the right?
It's because platform 2 is so narrow at that point so I think the barriers are part of the risk assessment for this.

== Doublepost prevention - post automatically merged: ==

It's not shut and hasn't been, but is restricted to 2 car trains except in an emergency and until December most Skegness services were booked as 3 cars.
Hopefully its used more often now!

The train after, a 158 unit, used platform 4 as normal.
 
Joined
15 Apr 2020
Messages
402
Location
Wakefield
The train in P4 ahead of yours was awaiting a gap on the ECML to depart, and now there are more 2 cars on those diagrams the option of using P3 is more readily available. There’s still nothing booked in there though in the new timetable.
 

Amos390

Member
Joined
22 Jan 2025
Messages
706
Location
Nottingham
It was never shut down, RHTT was timetabled into P3 and other freight would often use it to change ends, however as mentioned, it was very rare for passenger stock to move into there.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,312
Location
Yorks
It sounds as though extending platform 3 to three carriages could be a quick win for reliability in the area.
 

LowLevel

Established Member
Joined
26 Oct 2013
Messages
8,903
It sounds as though extending platform 3 to three carriages could be a quick win for reliability in the area.
You'd have to build over the foot tunnel under which is open to the elements shortly off the end of the platform which might make it a fairly expensive win unfortunately. It goes under the fast lines and then has an open to air section before it goes under platform 4's running line.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,312
Location
Yorks
You'd have to build over the foot tunnel under which is open to the elements shortly off the end of the platform which might make it a fairly expensive win unfortunately. It goes under the fast lines and then has an open to air section before it goes under platform 4's running line.

Might still be worthwhile perhaps.
 

Nottingham59

Established Member
Joined
10 Dec 2019
Messages
3,330
Location
Nottingham
Might still be worthwhile perhaps.
It's not a particularly wide hole. You might be able to bridge it with standard modular platform components, rather than having to use say concrete beams to create a base for installing the platform on top.

EDIT: "The modular pultruded platform sections come in 40mm and 100mm thicknesses providing clear spans of up to 3.4m."
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,312
Location
Yorks
It's not a particularly wide hole. You might be able to bridge it with standard modular platform components, rather than having to use say concrete beams to create a base for installing the platform on top.

EDIT: "The modular pultruded platform sections come in 40mm and 100mm thicknesses providing clear spans of up to 3.4m."

Those look very useful, for lots of potential improvements.
 
Status
Not open for further replies.

Top