What was nonsense was planning to put any more services through Castlefield without building 15/16. The pre-1998 timetable was unreliable, let alone those since.
As for boarding times, I think the main issue is caused by excessively short trains. If there were plenty of seats boarding would be much quicker even with end doors (though I agree doors at thirds would make more sense for trains through this corridor). So there is a need to have everything running as 8x20m/6x23m except at very quiet times - so the Oxford Road extensions are also vital.
In the meantime, if they reseated the Class 150s and 319s to have the Thameslink layout (i.e. 2+2 at 3+2 width) this would improve boarding times significantly - the Class 700 principle, as it were. Because the actual seats aren't as hard as a rock, this layout isn't all that unpleasant.
I completely agree. Building the Ordsall Chord without eliminating the bottleneck further down the line is an example of wacky planning. At the moment it is a £100 million white elephant for the 2 services each way that use it.
You would have to do the whole shebang/marginal gains to achieve the 14tph through Manchester and ensure it is a reliable operation.
- Platform extension to Oxford Road.
- New through platforms at Piccadilly
- Reconfiguration with multiple steps to Piccadilly platforms 13-16 rather than everyone standing at the same place on the platform and slowing embarkation.
- Greater optimisation of the trains to allow quick alighting/boarding. The amount of end door DMUs Northern use on the corridor through Manchester doesn't help.
- Greater optimisation of services. The existing timetable is not ideal and has clearly been a rush job. I think some services could be curtailed to terminate at Piccadilly with two new platforms. The hourly Crewe to Liverpool via Manchester Airport has proven somewhat unreliable and one that I would make hourly, with the other being a shuttle from Manchester to Crewe terminating into platform 16. At the moment capacity on 13/14 doesn't allow it and the alternative for it to cut across the throat of the services on 13/14 is not preferable.
- Find an alternative route for the two freight trains per hour through Manchester!
I just hope the DfT have a plan to tackle the bottleneck issue because it is a problem that needs a money and a solution. He may claim to know very little about trains but Grayling has been asleep at the wheel on the issue of capacity through Manchester.