Waverley125
Member
The developments with regard to HSR in the last few months are very good news, as it looks like we're finally going to get the system we've been crying out for. However, I'm still very worried about how and where this will be built.
Firstly, the conservatives have suggested going to Leeds via Heathrow, Manchester & Birmingham. This will make no time saving between Leeds & London, and seems to be aimed to increasing capacity rather than journey times.
This now seems to have been adapted as the logical route, despite the fact it's 40-50 miles too long, and spends 10 miles going in completely the wrong direction. It also intends to make heathrow the Hub of the network, rather than looking to build a new domestic HS terminus in the centre, or upgrading existing termini.
Surely the logical route is to stay central, branching off to places like Heathrow, Birmingham, Manchester etc. and using Sheffield, Leeds & Carlisle as main junctions for journeys into the northeast, northwest & Scotland?
So here's my proposed network:
http://www.flickr.com/photos/37256032@N05/3431628826/
this would, IMO, be a far more sensible network. As a key, Red lines are core routes, using limited stops & built for 225mph maximums, with potential to raise this limit. Gauged for double deck trains if expansion should require it.
Yellows are 'slow' lines, built to the same standards as the early LGVs in france, for a maximum of 185mph. These stop more frequently, for commuter services & can branch off into non-HS stations.
Black lines indicated non-HS routes potentially served by HS trains.
Green squares are stations, and only cover the routes they serve e.g. First stop on the 'red' route north is Sheffield, while the 'yellow' also calls at Milton Keynes, Northampton, Leicester & Derby.
'red' trains to Birmingham do not call anywhere else, but 'yellow' trains call MK, Northampton, Coventry, Birmingham Airport & Birmingham.
We have to accept this project will cost a staggering amount of money to complete. Included in this map as major infrastructure works are a new London terminal (probably at Euston), new severn tunnel, new Forth Rail Bridge, Reopening of the LSWR Exeter-plymouth route, New S&C and Woodhead routes, plus, most shockingly, a tunnel under the Irish sea.
Some of this may be fanciful, but this transport system would be, without a shadow of a doubt, the best in the world.
Firstly, the conservatives have suggested going to Leeds via Heathrow, Manchester & Birmingham. This will make no time saving between Leeds & London, and seems to be aimed to increasing capacity rather than journey times.
This now seems to have been adapted as the logical route, despite the fact it's 40-50 miles too long, and spends 10 miles going in completely the wrong direction. It also intends to make heathrow the Hub of the network, rather than looking to build a new domestic HS terminus in the centre, or upgrading existing termini.
Surely the logical route is to stay central, branching off to places like Heathrow, Birmingham, Manchester etc. and using Sheffield, Leeds & Carlisle as main junctions for journeys into the northeast, northwest & Scotland?
So here's my proposed network:
http://www.flickr.com/photos/37256032@N05/3431628826/
this would, IMO, be a far more sensible network. As a key, Red lines are core routes, using limited stops & built for 225mph maximums, with potential to raise this limit. Gauged for double deck trains if expansion should require it.
Yellows are 'slow' lines, built to the same standards as the early LGVs in france, for a maximum of 185mph. These stop more frequently, for commuter services & can branch off into non-HS stations.
Black lines indicated non-HS routes potentially served by HS trains.
Green squares are stations, and only cover the routes they serve e.g. First stop on the 'red' route north is Sheffield, while the 'yellow' also calls at Milton Keynes, Northampton, Leicester & Derby.
'red' trains to Birmingham do not call anywhere else, but 'yellow' trains call MK, Northampton, Coventry, Birmingham Airport & Birmingham.
We have to accept this project will cost a staggering amount of money to complete. Included in this map as major infrastructure works are a new London terminal (probably at Euston), new severn tunnel, new Forth Rail Bridge, Reopening of the LSWR Exeter-plymouth route, New S&C and Woodhead routes, plus, most shockingly, a tunnel under the Irish sea.
Some of this may be fanciful, but this transport system would be, without a shadow of a doubt, the best in the world.