• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Planning a trip to see Scotrail HSTs

Status
Not open for further replies.

Peter E

Member
Joined
13 Jul 2019
Messages
174
Looking to see coach 40623
?HA23 set. I understand that it is currently at Inverness having recently moved from Doncaster Wabtec. Any information greatly appreciated as to its further movements Many thanks Peter.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,334
Location
Glasgow
Looking to see coach 40623
?HA23 set. I understand that it is currently at Inverness having recently moved from Doncaster Wabtec. Any information greatly appreciated as to its further movements Many thanks Peter.
It's in HA23 still afaik.

HA23 has been in traffic several times ow since returning from Doncaster; first ran on the 24th September.

It's in traffic today on 1T06, 1A35, 1B80, 1H29.
 

Peter E

Member
Joined
13 Jul 2019
Messages
174
It's in HA23 still afaik.

HA23 has been in traffic several times ow since returning from Doncaster; first ran on the 24th September.

It's in traffic today on 1T06, 1A35, 1B80, 1H29.
Many thanks for your fast reply. Hopefully now should be able to track it.
 

Peter E

Member
Joined
13 Jul 2019
Messages
174
Best of luck, but yes shouldn't be too difficult to catch it at some point.

RTT or HSTGen should help with daily allocations.
Hello again. It appears that HA08 ? including 40608 (That I am looking for) has got north recently, maybe Inverness. Any update would be very much appreciated especially the power cars numbers. Thanks. Peter.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,334
Location
Glasgow
Hello again. It appears that HA08 ? including 40608 (That I am looking for) has got north recently, maybe Inverness. Any update would be very much appreciated especially the power cars numbers. Thanks. Peter.
Not released to traffic yet, as chuff chuff says, so no power cars allocated as such.
 

Fife coaster

Member
Joined
6 Feb 2017
Messages
22
How many HSTs out today as Fife services are decimated only one train above 3 cars till at least 08:30
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,334
Location
Glasgow
Thanks That explains the carnage this morning how do they expect to run the improved leven service in December if the HSTs are lying out of use
Difficult to run them when they are 'broken' to be fair.

Aberdeen ended up at capacity yesterday with four 'broken' sets for instance, though one later moved to Haymarket.

HA04 and HA02 should be available soon, which should help matters - the uplift in December is only by one diagram to 16 on weekdays and they have managed 16, even 17 sets out on occasions; it's the significant rise to 19 planned for May that will be 'interesting'.
 

Fife coaster

Member
Joined
6 Feb 2017
Messages
22
Difficult to run them when they are 'broken' to be fair.

Aberdeen ended up at capacity yesterday with four 'broken' sets for instance, though one later moved to Haymarket.

HA04 and HA02 should be available soon, which should help matters - the uplift in December is only by one diagram to 16 on weekdays and they have managed 16, even 17 sets out on occasions; it's the significant rise to 19 planned for May that will be 'interesting'.
Agreed but it seems to be not getting any traction pardon the pun at scotrail. It’s really annoying that front line staff are having to deal with the fall out day in day out and there is only so many miracles the Scotrail engineers can achieve with these tired old trains. I really hope they can secure the class 222 when they come of lease we need action asap from senior scotrail staff and transport Scotland
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,334
Location
Glasgow
I really hope they can secure the class 222 when they come of lease we need action asap from senior scotrail staff and transport Scotland
Last time that came up, it was ruled out on coast grounds.

The ROSCO wanted almost double what the HSTs are costing reputedly, though the publically readable board minutes generally obscure any financial information, so you can't get specifics.

I've not heard that it's been reconsidered, but if the price was right... maybe...

The HSTs have to be paid for until 2030.
 

InvHst

Member
Joined
9 Dec 2018
Messages
449
HA15 has moved from Aberdeen today to Inverness. Decembers timetable increase isn't a big issue on the grand scheme of things. Availability is always more after autumn so perfect timing for the summer increase next year
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,334
Location
Glasgow
HA15 has moved from Aberdeen today to Inverness. Decembers timetable increase isn't a big issue on the grand scheme of things. Availability is always more after autumn so perfect timing for the summer increase next year
Very true, noticed a lot of issues with adhesion today, even my local line which isn't usually too bad, we were slipping badly away from my local even though its a downhill start.

Can imagine the rudimentary WSP the power cars have still will see plenty of wheelspots needing attention.

Don't know what's come of the WSP upgrades that were planned a few months back?
 

Transilien

Member
Joined
10 Mar 2024
Messages
762
Location
Ayrshire
Is it just me or recently there have been little to no HST diagrams, like even less than before. Does anyone know the reason for this?
 
Last edited:

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,334
Location
Glasgow
Is it just me or recently there have been little to no HST diagrams, like even less than before. Does anyone know the reason for this?
Its autumn, so as Chuff Chuff says, many are awaiting attention for wheel damage, this happened last year and the year before where only about 60-66% of diagrams were HST for most of October/November.

Hopefully once the upgraded WSP equipment is fitted, autumn HST operations will be far more reliable.
 

Bikeman78

Established Member
Joined
26 Apr 2018
Messages
6,197
They can't always, which is why you also see 158s appearing.
When I went to Scotland in November 2022, it was like the 1990s again. 158s on long distance trains all over the place. The only route they weren't on was Glasgow to Edinburgh.
 

Davester50

Member
Joined
22 Feb 2021
Messages
1,067
Location
UK
Was interesting to see a broken up set at Cadder last week. Didn't expect to see anything other than full sets being serviced, and not individual carriages there.
 
Joined
3 Aug 2021
Messages
836
Location
Glasgow
Was interesting to see a broken up set at Cadder last week. Didn't expect to see anything other than full sets being serviced, and not individual carriages there.

The rest of the set would have been reformed and sent to Shields for the TPM (Tyre Profile Machine) / wheel lathe.
Whole HST sets don't fit at Shields.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,889
The rest of the set would have been reformed and sent to Shields for the TPM (Tyre Profile Machine) / wheel lathe.
Whole HST sets don't fit at Shields.
If any one is wondering why ScotRail's HSTs have struggled, then maybe consider:
- Power cars and trailers maintained at different depots
- New WSP equipment de-scoped from refurbishment
- Wheel lathe off route, with a lack of paths to get there, requiring a driver to ferry the set each way
- Wheel lathe can't accomodate a complete set, so it needs to be split before being sent
- A prevasive bad attitude towards the fleet from management downwards

Little wonder, then, that the fleet has struggled for availability.
 

Carntyne

Member
Joined
8 Jul 2015
Messages
1,026
If any one is wondering why ScotRail's HSTs have struggled, then maybe consider:
- Power cars and trailers maintained at different depots
- New WSP equipment de-scoped from refurbishment
- Wheel lathe off route, with a lack of paths to get there, requiring a driver to ferry the set each way
- Wheel lathe can't accomodate a complete set, so it needs to be split before being sent
- A prevasive bad attitude towards the fleet from management downwards

Little wonder, then, that the fleet has struggled for availability.
Their age surely a factor?

There's a lathe at Inverness as well, bought at great expense.
 
Status
Not open for further replies.

Top