Planned maintenance schedule?

Status
Not open for further replies.

pedr

Member
Joined
24 Aug 2016
Messages
396
Is there a good list of future planned maintenance works anywhere on the net? I’m looking ahead to the late May bank holiday and wondering if there’s a risk of disruption or rail replacement - buses. I’m looking at a Bromsgrove to Chester journey, or returning, on the Saturday or Monday, and neither the Network Rail nor NRE sites seemed to have useful information.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

_toommm_

Established Member
Joined
8 Jul 2017
Messages
6,295
Location
South West London
National Rail Enquiries will tell you about future disruption up to a certain date, but engineering works are only being confirmed up to 6 weeks before now instead of the previous 12, so you'd be hard pressed to find any info on the May BH
 

PHILIPE

Veteran Member
Joined
14 Nov 2011
Messages
13,472
Location
Caerphilly
If you go to the NRE Website and select "Future Engineering Work" and from there you can select a date and a TOC working on your route and find the details but as the previous poster has already said details could alter.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,667
National Rail Enquiries will tell you about future disruption up to a certain date, but engineering works are only being confirmed up to 6 weeks before now instead of the previous 12, so you'd be hard pressed to find any info on the May BH
That isn't quite true, it is the timetable that isn't being confirmed. If the engineering works weren't confirmed until 6 weeks out then the timetable would be about 2 weeks out!
 

_toommm_

Established Member
Joined
8 Jul 2017
Messages
6,295
Location
South West London
That isn't quite true, it is the timetable that isn't being confirmed. If the engineering works weren't confirmed until 6 weeks out then the timetable would be about 2 weeks out!

I said up to - there were examples of advances only just being released on time last year...
 