johnnychips

Established Member
Joined
19 Nov 2011
Messages
3,826
Location
Leeds
Could they be thinking of routing the Hope Valley stoppers via Stockport if the tram-train service is introduced?

Perhaps as far as Stockport is possible, but paths from Stockport to Manchester may be problematic. That would also cut New Mills off from Sheffield, and I suppose you would have to have some sort of service serving the main Marple station and Strines. Chinley isn't the best place for a turnaround.

http://www.transportforgreatermanch...downloads/id/4702/item_08_tram-train_strategy

This makes clear that the preferred option over other tram-train routes is the Marple one, seemingly ten an hour better value than five. Perhaps you could route the HV stopper through Hyde, though that does give a pinch point at Romily. But it does kibosh the idea of a fast train.

Back on the topic, it seems the introduction of a fast train through the Wye Valley would hit capacity issues at the Manchester end.
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,432
Location
Yorks
How would it 'screw up' Hope Valley services?
Let's assume it makes them no worse, or an alternative is found that's as good, do you think a significant Metrolink (tram/train) related passenger increase from Marple must always be rejected in favour of anything on the Hope Valley?

Well, that's the problem isn't it. If you're running a stopper via Marple every six minutes where are you going to put the displaced Hope Valley trains. Via Stockport ? fat chance as it hasn't even got enough paths for a decent service to Chester via Altrincham.

Until someone reopens Woodhead, the Hope Valley is the main InterCity route between Manchester and Sheffield, so it does take precedence over tram trains through Marple.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,760
Location
Nottingham
Nobody normal is going to use the Hope Valley stopper for Manchester-Sheffield journeys, so its end-to-end journey time isn't particularly important. Diverting it via Hyde makes it a bit slower but also provides extra connectivity, and a stop at Guide Bridge would connect to Glossop which might be useful.

If an extra Manchester-Sheffield train was added after Northern Hub then it might call at the more important stops on the way so people at busier stations such as Chinley didn't have to rely on the local.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,432
Location
Yorks
Nobody normal is going to use the Hope Valley stopper for Manchester-Sheffield journeys, so its end-to-end journey time isn't particularly important. Diverting it via Hyde makes it a bit slower but also provides extra connectivity, and a stop at Guide Bridge would connect to Glossop which might be useful.

If an extra Manchester-Sheffield train was added after Northern Hub then it might call at the more important stops on the way so people at busier stations such as Chinley didn't have to rely on the local.

But Marple's before you turn off towards Hyde. Plus, isn't the line through Guide Bridge rather busy as well ?
 

Greybeard33

Established Member
Joined
18 Feb 2012
Messages
4,335
Location
Greater Manchester
I'm pretty certain that the passing loop at Grindleford has been agreed and that planning permission has been sought.
No, it seems that the loop at Grindleford, and the fourth fast service along the Hope Valley, have fallen victim to de-scoping of the Northern Hub:
Network Rail said:
Our previous consultation events in 2013 looked at proposed work in Grindleford and Dore. Since then, the project has moved on with refreshed plans at Dore and an improved option between Bamford and Jaggers Lane, which is a replacement for what was previously proposed at Grindleford.

Project update

We consulted on previous plans to improve the railway in the Hope Valley in November 2013 and collected valuable feedback from the local community.

In November 2013, our plans included building new track near Grindleford station. Since then, the rail industry has reviewed the timetable requirements for the route and has decided there is a need for three fast passenger trains per hour. The previous requirement of four fast trains per hour meant we had to build the new track at Grindleford. Now the scope has changed, we don’t have to pursue this option and can avoid the environmental impacts highlighted as significant concerns in the previous consultation.

The plans for works at Dore and Totley Station and at Dore South Curve remain largely unchanged from what we consulted on in 2013. We are now seeking the views of the local community on the current proposals.
http://www.networkrail.co.uk/improvements/northern-hub/doregrindleford/
 
Last edited:

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,760
Location
Nottingham
But Marple's before you turn off towards Hyde. Plus, isn't the line through Guide Bridge rather busy as well ?

The tram-trains and the residual train service would share tracks for a section through Romiley and Marple. That's why they are tram-trains and not simply Metrolink trams.

The trains would then take the Hyde route from Romiley Junction, replacing the existing trains on this route and therefore not requiring any more capacity between Piccadilly and Guide Bridge. They do this firstly to provide service to Hyde and secondly because they would have a faster journey than if they were stuck behind stopping tram-trains via Bredbury.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,432
Location
Yorks
Supposing a six minute headway service of tram-trains and trains does work (which I'm not convinced about) that still doesn't leave much leeway for future improvements to train services as you're either relying on the crowded section through Stockport or the crowded section through Guide Bridge.
 

Ash Bridge

Established Member
Joined
17 Mar 2014
Messages
4,225
Location
Stockport
Is it the intention that the Rose Hill branch service will also be operated by Tram-Trains, which will then operate via Bredbury & Reddish North rather then as now with the trains running via Hyde & Guide Bridge?
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,062
Location
Reston City Centre
A few thoughts:

Firstly, petitions... they’re generally a waste of time (usually there to give false hope to needy people). Unless there’s a good business case for re-opening the line, and someone wants to spend their own money on it, it’s basically a non-starter (and no petition is going to tip the balance).

Secondly, Bakewell really isn’t that big. Maybe five thousand people? If you want to build lines to connect unserved conurbations then there are much better candidates (though these tend to be less picturesque places so don’t tend to involve reopening some scenic railway closed fifty years ago, which means that nostalgic train enthusiasts aren’t so interested).

Thirdly, the benchmark I use in assessing a new/re-opened line is the commercial bus services in the area, since they give an idea of what baseline demand there might be and where that demand might be to. For example, Alloa had seven or eight buses an hour to Stirling (before the railway opened), so there was a market there. Ebbw Vale had regular buses to Cardiff so no surprise that the railway has won a decent number of passengers.

(In terms of lines discussed recently on this Forum, Lowestoft has frequent buses to Great Yarmouth, Portishead has a good bus service to Bristol, so both sound fairly positive starting points)

Buses further down the valley from Bakewell to Matlock/ Derby are regular enough for that part of the world (hourly “slow” 6.1 plus hourly “fast” TP). A simple single track line from Matlock to Bakewell (requiring an extra 153/156 to extend the service from Nottingham each hour) may have some merit (albeit at the expense of a popular preserved railway at the Matlock end).

However, whilst Bakewell has roughly two commercial bus services per hour to Sheffield (the 218 becomes a straight half hourly service later this month, there was previously the 214 each hour via Fox House and the 218 each hour via Owler Bar) there’s only one per hour to Buxton (same as from Bakewell to Chesterfield) and Bakewell only has three or four buses per day to Stockport/Manchester which suggests that a link to Sheffield would be more use for everyday passenger demand than one to Stockport/Manchester. However, that doesn’t come up with the answer of “reopen some scenic line that was closed in the 1960s” and these kind of threads seem to be more about justifying such pre-determined “solutions” than dealing with actual 21st century demand.

Fourthly, if you want to improve capacity from the East Midlands to the North West (i.e. this reopening has grander ambitions than just serving the five thousand people of Bakewell - esp if we accept that there's a pretty poor business case for this being A Local Project For Local People) then that could be done fairly easily/cheaply through the Hope Valley. A second platform at Dore and a passing loop elsewhere are already on the agenda. Some skip-stopping could help. Almost all services in the Hope Valley are only two/three/four coaches long, so there’s plenty scope to add extra coaches (given that fast services from Sheffield to Manchester only stop at Stockport, which is capable of taking 390s, sticking an extra coach or three onto the existing Northern/ TPE/ EMT services seems feasible). Things like four aspect signals seem a lot simpler/ cheaper/ quicker than reopening an old line (but, as experience on this Forum has taught me, where’s the fun in something simple/ cheap/ quick?).

The idea that we need a separate line through the Peak District to relieve pressure on the Hope Valley route ignores the fact that there are simpler ways of enhancing capacity in the Hope Valley (capacity is being improved at Dore etc). However, trying to weave various weak arguments together to try to conjure up some kind of “bigger picture” argument about National Strategic Importance is obviously popular. Doesn’t mean it’s right though.

Fifthly, the idea that “if this were in Scotland, it’d be open today” doesn’t wash with me. As a Scot living in Yorkshire, I know that there are a number of lines north of the border that closed with little likelihood of reopening, and plenty of lines through fairly isolated parts of England that remain open (lightly used lines in England like Knottingley – Goole and Hellifield – Carnforth survived the axe yet there are no trains to towns like Leven, Peterhead, Grangemouth, Forfar, no train station at the two main Scottish airports...). This “grass is always greener” argument doesn’t reflect the evidence, sorry. Scotland has some places badly served by rail (e.g. the railway didn’t adapt to post-war New Towns like Glenrothes or Irvine and is no use for the centre of places like Livingston or Cumbernauld) just like the rest of the UK.

Whilst there’s been new lines (or re-opened lines) in Scotland since privatisation, these are roughly as many miles as the increase in Manchester Metrolink during that equivalent period (to put it into perspective). The one exception will be the Borders line when it eventually opens (interesting that there’s so much complaining about delays to the Todmorden scheme but the delays to Tweedbank don’t seem to get the same ire from enthusiasts...), but that’s an exceptional route being built for exceptional reasons (terrible business case south of Gorebridge but the price Labour had to pay for LibDem support in Hollyrood a decade ago).

The Borders line is an oddity and one that shouldn’t be used as a benchmark for the kind of reopening we can expect in the future, either side of the border (though I suspect that it will be used as justification for any fantasy schemes elsewhere – take a drink every time you read something like “...but if the Borders line reopened then my scheme deserves to reopen too”...).

Bakewell station would be popular on a Summer Sunday, but we’re not exactly running short of better alternatives that we could be spending any spare money on (rolling stock replacement, electrification of existing lines, bottlenecks that inconvenience thousands of people a day).

Still, there’s no point in arguing with the nostalgic element, they’ve made their minds up that We Must Go Back To How Things Were Fifty Years Ago, regardless of the fact that the world has moved on. For example, the A6 used to be the main road from London to Manchester (as it’s number suggests), but now nobody suggests diverting London – Manchester traffic down it.

(as for the other stuff like "we need to close the Monsall Trail because too many people are using, especially tourists and disabled people"... I'm not sure that there's any point arguing with this kind of debate - most people on this thread have made their minds up already and to hell with the evidence - even disputing proper surveys carried out into reopening)
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,760
Location
Nottingham
Supposing a six minute headway service of tram-trains and trains does work (which I'm not convinced about) that still doesn't leave much leeway for future improvements to train services as you're either relying on the crowded section through Stockport or the crowded section through Guide Bridge.

I think that is a case of not doing something which is predicted to have definite benefits, in order to preserve the possibility of something which is of unproven benefit and pretty unlikely to happen anyway. If anything like that ever did happen then the tram-train could probably be restored to heavy rail quite easily, and the vehicles used somewhere else.

Going back to the original question, Northern Hub has suggested (as an option) another fast service on the Hope Valley might use the Dore south curve to serve Derby and beyond. This could be re-routed via Bakewell. without changing the number of trains on the busy sections either end, with only Chesterfield losing out.

Incidentally the population of Bakewell is only 4000 and even adding in Matlock and Buxton the populations served are far less than that of Chesterfield.
 

ringi

Member
Joined
4 Jan 2015
Messages
15
Trams are well known for getting commuters out of their cars, the railway system is there for the public and most of the public have cars for long trip, so I consider commuting trips to be more important.

Why can’t some ‘local’ Hope Valley service terminate at Marple, so people can change to the tram? Or terminate at Stockport, given there is a train every 10 minutes from Stockport into Manchester.
 

Robertj21a

On Moderation
Joined
22 Sep 2013
Messages
7,691
A few thoughts:

Firstly, petitions... they’re generally a waste of time (usually there to give false hope to needy people). Unless there’s a good business case for re-opening the line, and someone wants to spend their own money on it, it’s basically a non-starter (and no petition is going to tip the balance).

Secondly, Bakewell really isn’t that big. Maybe five thousand people? If you want to build lines to connect unserved conurbations then there are much better candidates (though these tend to be less picturesque places so don’t tend to involve reopening some scenic railway closed fifty years ago, which means that nostalgic train enthusiasts aren’t so interested).

Thirdly, the benchmark I use in assessing a new/re-opened line is the commercial bus services in the area, since they give an idea of what baseline demand there might be and where that demand might be to. For example, Alloa had seven or eight buses an hour to Stirling (before the railway opened), so there was a market there. Ebbw Vale had regular buses to Cardiff so no surprise that the railway has won a decent number of passengers.

(In terms of lines discussed recently on this Forum, Lowestoft has frequent buses to Great Yarmouth, Portishead has a good bus service to Bristol, so both sound fairly positive starting points)

Buses further down the valley from Bakewell to Matlock/ Derby are regular enough for that part of the world (hourly “slow” 6.1 plus hourly “fast” TP). A simple single track line from Matlock to Bakewell (requiring an extra 153/156 to extend the service from Nottingham each hour) may have some merit (albeit at the expense of a popular preserved railway at the Matlock end).

However, whilst Bakewell has roughly two commercial bus services per hour to Sheffield (the 218 becomes a straight half hourly service later this month, there was previously the 214 each hour via Fox House and the 218 each hour via Owler Bar) there’s only one per hour to Buxton (same as from Bakewell to Chesterfield) and Bakewell only has three or four buses per day to Stockport/Manchester which suggests that a link to Sheffield would be more use for everyday passenger demand than one to Stockport/Manchester. However, that doesn’t come up with the answer of “reopen some scenic line that was closed in the 1960s” and these kind of threads seem to be more about justifying such pre-determined “solutions” than dealing with actual 21st century demand.

Fourthly, if you want to improve capacity from the East Midlands to the North West (i.e. this reopening has grander ambitions than just serving the five thousand people of Bakewell - esp if we accept that there's a pretty poor business case for this being A Local Project For Local People) then that could be done fairly easily/cheaply through the Hope Valley. A second platform at Dore and a passing loop elsewhere are already on the agenda. Some skip-stopping could help. Almost all services in the Hope Valley are only two/three/four coaches long, so there’s plenty scope to add extra coaches (given that fast services from Sheffield to Manchester only stop at Stockport, which is capable of taking 390s, sticking an extra coach or three onto the existing Northern/ TPE/ EMT services seems feasible). Things like four aspect signals seem a lot simpler/ cheaper/ quicker than reopening an old line (but, as experience on this Forum has taught me, where’s the fun in something simple/ cheap/ quick?).

The idea that we need a separate line through the Peak District to relieve pressure on the Hope Valley route ignores the fact that there are simpler ways of enhancing capacity in the Hope Valley (capacity is being improved at Dore etc). However, trying to weave various weak arguments together to try to conjure up some kind of “bigger picture” argument about National Strategic Importance is obviously popular. Doesn’t mean it’s right though.

Fifthly, the idea that “if this were in Scotland, it’d be open today” doesn’t wash with me. As a Scot living in Yorkshire, I know that there are a number of lines north of the border that closed with little likelihood of reopening, and plenty of lines through fairly isolated parts of England that remain open (lightly used lines in England like Knottingley – Goole and Hellifield – Carnforth survived the axe yet there are no trains to towns like Leven, Peterhead, Grangemouth, Forfar, no train station at the two main Scottish airports...). This “grass is always greener” argument doesn’t reflect the evidence, sorry. Scotland has some places badly served by rail (e.g. the railway didn’t adapt to post-war New Towns like Glenrothes or Irvine and is no use for the centre of places like Livingston or Cumbernauld) just like the rest of the UK.

Whilst there’s been new lines (or re-opened lines) in Scotland since privatisation, these are roughly as many miles as the increase in Manchester Metrolink during that equivalent period (to put it into perspective). The one exception will be the Borders line when it eventually opens (interesting that there’s so much complaining about delays to the Todmorden scheme but the delays to Tweedbank don’t seem to get the same ire from enthusiasts...), but that’s an exceptional route being built for exceptional reasons (terrible business case south of Gorebridge but the price Labour had to pay for LibDem support in Hollyrood a decade ago).

The Borders line is an oddity and one that shouldn’t be used as a benchmark for the kind of reopening we can expect in the future, either side of the border (though I suspect that it will be used as justification for any fantasy schemes elsewhere – take a drink every time you read something like “...but if the Borders line reopened then my scheme deserves to reopen too”...).

Bakewell station would be popular on a Summer Sunday, but we’re not exactly running short of better alternatives that we could be spending any spare money on (rolling stock replacement, electrification of existing lines, bottlenecks that inconvenience thousands of people a day).

Still, there’s no point in arguing with the nostalgic element, they’ve made their minds up that We Must Go Back To How Things Were Fifty Years Ago, regardless of the fact that the world has moved on. For example, the A6 used to be the main road from London to Manchester (as it’s number suggests), but now nobody suggests diverting London – Manchester traffic down it.

(as for the other stuff like "we need to close the Monsall Trail because too many people are using, especially tourists and disabled people"... I'm not sure that there's any point arguing with this kind of debate - most people on this thread have made their minds up already and to hell with the evidence - even disputing proper surveys carried out into reopening)


Difficult to add anything to that - factual and realistic. Thank You.
 

Greybeard33

Established Member
Joined
18 Feb 2012
Messages
4,335
Location
Greater Manchester
Is it the intention that the Rose Hill branch service will also be operated by Tram-Trains, which will then operate via Bredbury & Reddish North rather then as now with the trains running via Hyde & Guide Bridge?
The Network Rail Alternative Solutions RUS (July 2013) used TfGM's Marple proposal as a tram-train case study and gave more detail than TfGM itself has placed in the public domain. The RUS stated (p.73):
The TfGM modelled proposal is a tram train extension of the Metrolink Eccles to Manchester Piccadilly services running through to
Marple at a 12-minute headway, with:
• all tram train services calling at all stations.
• the existing rail services modified as follows:
– – all Manchester Piccadilly– Marple / New Mills via Bredbury services are withdrawn
– – existing local services from Manchester Piccadilly – Marple Rose Hill via Guide Bridge service are retained
– – existing local services from Manchester Piccadilly to Chinley and the Hope Valley (one train per hour) serving Ashburys and
Maple are diverted to call at Guide Bridge and Hyde Central, continuing to Romiley, Marple, Strines, New Mills etc.
http://www.networkrail.co.uk/browse%20documents/rus%20documents/route%20utilisation%20strategies/network/working%20group%205%20-%20alternative%20solutions/network%20rus%20alternative%20solutions.pdf

However, the TfGM strategy document is more recent (October 2013) and contains a very sketchy and small scale map that appears to show the tram-train terminus at Rose Hill not Marple. If this is really a change in the proposal, not just an error/misinterpretation, it would have the advantages that the shared section of line would be shorter (just Romiley to Marple Wharf Jn) and it would not be necessary to (re)construct a bay platform at Marple. However, the car park at Rose Hill is smaller than that at Marple.
 

Ash Bridge

Established Member
Joined
17 Mar 2014
Messages
4,225
Location
Stockport
The Network Rail Alternative Solutions RUS (July 2013) used TfGM's Marple proposal as a tram-train case study and gave more detail than TfGM itself has placed in the public domain. The RUS stated (p.73):

http://www.networkrail.co.uk/browse%20documents/rus%20documents/route%20utilisation%20strategies/network/working%20group%205%20-%20alternative%20solutions/network%20rus%20alternative%20solutions.pdf

However, the TfGM strategy document is more recent (October 2013) and contains a very sketchy and small scale map that appears to show the tram-train terminus at Rose Hill not Marple. If this is really a change in the proposal, not just an error/misinterpretation, it would have the advantages that the shared section of line would be shorter (just Romiley to Marple Wharf Jn) and it would not be necessary to (re)construct a bay platform at Marple. However, the car park at Rose Hill is smaller than that at Marple.

That's interesting, Thankyou. Regarding car parking, Rose Hill is a easy flat walk from the centre of Marple and really no further than the main station, which is located on a very long steep incline, it's just possible that some presently using their car to Marple station may be encouraged to stroll to Rose Hill instead?
 
Last edited:

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,484
Location
A typical commuter-belt part of north-west England
The Borders line is an oddity and one that shouldn't be used as a benchmark for the kind of reopening we can expect in the future, either side of the border (though I suspect that it will be used as justification for any fantasy schemes elsewhere – take a drink every time you read something like “...but if the Borders line reopened then my scheme deserves to reopen too”...).

As ever, your most full and detailed posting covers many well thought-out responses to a number of queries that have been raised upon this thread, for which you are justifiably well-known and respected upon this website.

With the matter of the Borders Railway thread on this website, that I have chosen to display above, from which your comments are self-explanatory, this did indeed bring the fantasists out of the closet on the said thread with a number of fantasy-based postings (such as irresponsibly costed further line expansion ideas) that any businessman with a modicum of financial management would be despairing of, noting their proposer's obviously shewn lack of any business acumen. One can but only but hope that these people are never trusted with the care of financial purse-strings, either commercial or public utility....<(
 

TheKnightWho

Established Member
Joined
17 Oct 2012
Messages
3,183
Location
Oxford
As ever, your most full and detailed posting covers many well thought-out responses to a number of queries that have been raised upon this thread, for which you are justifiably well-known and respected upon this website.

With the matter of the Borders Railway thread on this website, that I have chosen to display above, from which your comments are self-explanatory, this did indeed bring the fantasists out of the closet on the said thread with a number of fantasy-based postings (such as irresponsibly costed further line expansion ideas) that any businessman with a modicum of financial management would be despairing of, noting their proposer's obviously shewn lack of any business acumen. One can but only but hope that these people are never trusted with the care of financial purse-strings, either commercial or public utility....<(

I do think that a sound business case is not always what's on people's minds when they make those kinds of posts.
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,484
Location
A typical commuter-belt part of north-west England
I do think that a sound business case is not always what's on people's minds when they make those kinds of posts.

Perhaps an ingrained sense of business realism fostered by over forty years in industry, with thirty of these in senior management positions, precludes any appreciation of "fantasy" posts.

Yes, before I am regaled with information appertaining to business scenarios used in training exercises where unusual situations have to be faced by those involvees so participating, I have set many such scenarios over the years to test some of both my middle and junior managerial staff, but financial cost management was always an integral part of these.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,760
Location
Nottingham
Why can’t some ‘local’ Hope Valley service terminate at Marple, so people can change to the tram? Or terminate at Stockport, given there is a train every 10 minutes from Stockport into Manchester.

There's no need to force everyone to change at Marple because there is capacity to run the trains between the tram-trains. If necessary you could push a couple of tram-trains off an exact 6min interval to make a bit more time for the train in between.

Terminating at Stockport is difficult because of the track layout and signalling. There is no south-facing bay platform so trains have to tip out in a through platform then go off down the line (probably to Heaton Norris) and wait until it is time to return on the other track.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,432
Location
Yorks
You'll have to excuse me tbtc, however, I won't be joining in the gushing praise of your post.

Secondly, Bakewell really isn’t that big. Maybe five thousand people? If you want to build lines to connect unserved conurbations then there are much better candidates (though these tend to be less picturesque places so don’t tend to involve reopening some scenic railway closed fifty years ago, which means that nostalgic train enthusiasts aren’t so interested).

It is true that there are less picturesque places that need a rail link. Skelmersdale springs to mind, as does Leigh in Lancashire. If only we'd had some progress in towns such as these, you might have part of a point. Instead we get nothing in one and a glorified bus lane in the other.

Buses further down the valley from Bakewell to Matlock/ Derby are regular enough for that part of the world (hourly “slow” 6.1 plus hourly “fast” TP). A simple single track line from Matlock to Bakewell (requiring an extra 153/156 to extend the service from Nottingham each hour) may have some merit (albeit at the expense of a popular preserved railway at the Matlock end).

There you have it. Even you agree :D

However, whilst Bakewell has roughly two commercial bus services per hour to Sheffield (the 218 becomes a straight half hourly service later this month, there was previously the 214 each hour via Fox House and the 218 each hour via Owler Bar) there’s only one per hour to Buxton (same as from Bakewell to Chesterfield) and Bakewell only has three or four buses per day to Stockport/Manchester which suggests that a link to Sheffield would be more use for everyday passenger demand than one to Stockport/Manchester. However, that doesn’t come up with the answer of “reopen some scenic line that was closed in the 1960s” and these kind of threads seem to be more about justifying such pre-determined “solutions” than dealing with actual 21st century demand.

I'd have thought that you, more than anyone would appreciate that we have to live in the real world. No one is going to dig a new railway through the Peak District from Bakewell to Sheffield. Is that a valid reason not to improve transport anywhere else where the way is (effectively) already built ?

Come to think of it, a railway line from London to Belfast would be quite handy, but since we can't do that, we might as well not bother with any smaller scale improvements anywhere else.

Fourthly, if you want to improve capacity from the East Midlands to the North West (i.e. this reopening has grander ambitions than just serving the five thousand people of Bakewell - esp if we accept that there's a pretty poor business case for this being A Local Project For Local People) then that could be done fairly easily/cheaply through the Hope Valley. A second platform at Dore and a passing loop elsewhere are already on the agenda. Some skip-stopping could help. Almost all services in the Hope Valley are only two/three/four coaches long, so there’s plenty scope to add extra coaches (given that fast services from Sheffield to Manchester only stop at Stockport, which is capable of taking 390s, sticking an extra coach or three onto the existing Northern/ TPE/ EMT services seems feasible). Things like four aspect signals seem a lot simpler/ cheaper/ quicker than reopening an old line (but, as experience on this Forum has taught me, where’s the fun in something simple/ cheap/ quick?).

Only it's not simple cheap or quick, as we well know from upgrades such as the WCML. You've been on here long enough to know that such things seem nice and simple but in reality are expensive and disruptive.

Plus, on top of Bakewell's 5,000, there are Buxton's 20,000, who could be served by a curve off the new main line. Why assume that they're only interested in going to Manchester !

The idea that we need a separate line through the Peak District to relieve pressure on the Hope Valley route ignores the fact that there are simpler ways of enhancing capacity in the Hope Valley (capacity is being improved at Dore etc). However, trying to weave various weak arguments together to try to conjure up some kind of “bigger picture” argument about National Strategic Importance is obviously popular. Doesn’t mean it’s right though.

Weak arguments - it wasn't me, nor I suspect anyone on this forum who instigated a study on reopening the route ( a study which suggests that even a basic service would be viable ten years from now, but it's obviously a weak argument because it doesn't fit in with your world view).

Fifthly, the idea that “if this were in Scotland, it’d be open today” doesn’t wash with me. As a Scot living in Yorkshire, I know that there are a number of lines north of the border that closed with little likelihood of reopening, and plenty of lines through fairly isolated parts of England that remain open (lightly used lines in England like Knottingley – Goole and Hellifield – Carnforth survived the axe yet there are no trains to towns like Leven, Peterhead, Grangemouth, Forfar, no train station at the two main Scottish airports...). This “grass is always greener” argument doesn’t reflect the evidence, sorry. Scotland has some places badly served by rail (e.g. the railway didn’t adapt to post-war New Towns like Glenrothes or Irvine and is no use for the centre of places like Livingston or Cumbernauld) just like the rest of the UK.

Whilst there’s been new lines (or re-opened lines) in Scotland since privatisation, these are roughly as many miles as the increase in Manchester Metrolink during that equivalent period (to put it into perspective). The one exception will be the Borders line when it eventually opens (interesting that there’s so much complaining about delays to the Todmorden scheme but the delays to Tweedbank don’t seem to get the same ire from enthusiasts...), but that’s an exceptional route being built for exceptional reasons (terrible business case south of Gorebridge but the price Labour had to pay for LibDem support in Hollyrood a decade ago).

The Borders line is an oddity and one that shouldn’t be used as a benchmark for the kind of reopening we can expect in the future, either side of the border (though I suspect that it will be used as justification for any fantasy schemes elsewhere – take a drink every time you read something like “...but if the Borders line reopened then my scheme deserves to reopen too”...).

Across the the whole of Britain, towns were cut off of the network during the Beeching era whilst less likely contenders survived for political reasons, therefore your insinuation that this was a purely English phenomena is not only irrelevant, but incorrect. My complaint is about the disparity in the recent past, (as you well know, yet choose to ignore). The fact remains that whilst Scotland has forged ahead with reopenings during the last fifteen years, such improvements have ground to a halt like a wheezing nag in dear old England.

Still, as you mention, the Borders line (along with all the others) are the product of a working political system in tune with the needs of its constituents. Perhaps if we manage to ditch our rotten to the core electoral system, we may one day have some progress.

Bakewell station would be popular on a Summer Sunday, but we’re not exactly running short of better alternatives that we could be spending any spare money on (rolling stock replacement, electrification of existing lines, bottlenecks that inconvenience thousands of people a day).

Still, there’s no point in arguing with the nostalgic element, they’ve made their minds up that We Must Go Back To How Things Were Fifty Years Ago, regardless of the fact that the world has moved on. For example, the A6 used to be the main road from London to Manchester (as it’s number suggests), but now nobody suggests diverting London – Manchester traffic down it.

You do so love your nostalgia.

The fact is the A6 is still an important strategic link in the National road network the last time I checked, or perhaps you believe that should have been closed as well.

(as for the other stuff like "we need to close the Monsall Trail because too many people are using, especially tourists and disabled people"... I'm not sure that there's any point arguing with this kind of debate - most people on this thread have made their minds up already and to hell with the evidence - even disputing proper surveys carried out into reopening)

Would that be the study that suggested that even going by our our flawed and limited cost benefit formula, the route would be viable in ten years time ? Whilst recognising the limitations in its remit, I certainly won't be rubbishing the report, because it provides evidence that the line would be of use. In fact, I have referred to it on several occasions !

By the way, you do realise, don't you, that users of the Monsal trail don't pay any tolls or fares to walk it ? This means that all of its construction and maintenance costs will have had to be justified by wider social and economic benefits such as leisure activity and the wellbeing of local residents, which can't be recouped by direct user payments. Yet I'm sure on some threads somebody keeps referring to such things as "woolly". Now who could that have been :p
 
Last edited:

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,484
Location
A typical commuter-belt part of north-west England
There's no need to force everyone to change at Marple because there is capacity to run the trains between the tram-trains. If necessary you could push a couple of tram-trains off an exact 6min interval to make a bit more time for the train in between.

Terminating at Stockport is difficult because of the track layout and signalling. There is no south-facing bay platform so trains have to tip out in a through platform then go off down the line (probably to Heaton Norris) and wait until it is time to return on the other track.

Was there ever a short south-facing bay platform situated in the area of platforms 3 and 4 at Stockport station?
 

Ash Bridge

Established Member
Joined
17 Mar 2014
Messages
4,225
Location
Stockport
Was there ever a short south-facing bay platform situated in the area of platforms 3 and 4 at Stockport station?

During March 1993 I boarded a class 156 (Bound for Norwich) which was standing in the South end bay platform that was located between platforms 1 and 2, cannot remember how long after that it remained in use, it could have been at a similar time to when the station canopies were replaced. There also was a bay at the South end of platforms 3 & 4 that from memory in the early 1970s was often used for the stabling of electric locomotives plus the occasional parcel van, especially at weekends.
 
Last edited:

Tomnick

Established Member
Joined
10 Jun 2005
Messages
5,934
Was there ever a short south-facing bay platform situated in the area of platforms 3 and 4 at Stockport station?
I've found a diagram showing the layout in 1976, showing that there were indeed bays at the south end - one in each island. At that time, it appears that the Down side bay had already been abolished. Neither were accessible directly from the Down lines though (the bay on the Down island was accessed by a trailing connection, through a single slip over the Down Fast, off the Up Fast).
 

johnnychips

Established Member
Joined
19 Nov 2011
Messages
3,826
Location
Leeds

Ash Bridge

Established Member
Joined
17 Mar 2014
Messages
4,225
Location
Stockport
I've found a diagram showing the layout in 1976, showing that there were indeed bays at the south end - one in each island. At that time, it appears that the Down side bay had already been abolished. Neither were accessible directly from the Down lines though (the bay on the Down island was accessed by a trailing connection, through a single slip over the Down Fast, off the Up Fast).

An image here of the South end of Stockport Edgeley Station 1958
(Not my photograph)
 

Attachments

  • image.jpg
    image.jpg
    167 KB · Views: 39

Greybeard33

Established Member
Joined
18 Feb 2012
Messages
4,335
Location
Greater Manchester
An image here of the South end of Stockport Edgeley Station 1958
(Not my photograph)
The outline of the filled-in bays can still be seen in the present-day Stockport platforms. The Up bay has been concreted over, while the Down bay is occupied by a flower bed and an equipment shed.

Platforms 1, 2 & 3 have all been extended southwards to accommodate Pendolinos, which could make it difficult to reinstate the bays.
 

Tomnick

Established Member
Joined
10 Jun 2005
Messages
5,934
Thanks both. Even if one of the bays were to be reinstated and provided with a facing connection from the Down (not at all trivial under the current signalling arrangements!), the extra moves across most of the layout in each direction would make it very difficult to path such services.
 

tocguard

Member
Joined
16 Nov 2014
Messages
124
Location
Derbyshire
A previous post refers to having to find an extra sprinter unit which would have some benefit if the line were extended to Bakewell. There is, however, the option to alter the stopping pattern and timings which wouldn't require any additional units . There is currently just short of 40min turn around time in Nottingham for units working this route. Shortening this to say 15 minutes and jigging the timetable may mean it's achievable to reach Bakewell with no need to have any more trains. If you compare the Derby - Crewe route (1hr 20min journey), there is only 7 min turnaround at Crewe and 14 at Derby. There would be little in the way of delays happening which would jeopardise a tight timetable on am extended Bakewell route because there are no other lines and services to contend with.

It's also worth noting that Peak Rail are actually in support of a reopened line to Bakewell (at least) as they believe they can work together with Network Rail as they have good relations with ongoing issues. There is no reason why Peak Rail can't keep their line and the new line laid alongside, it was originally double tracked! Any operational proposals can be looked into with regards to the potential problem of who runs to Bakewell when.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,760
Location
Nottingham
The Matlock-Nottingham will be extended to Newark this year, where it has to turn round on the running lines so can't spend very long there without blocking something else. Thus its timings are pretty much fixed into the future unless its destination is changed again.
 

mwmbwls

Member
Joined
14 Dec 2009
Messages
682
Thanks for this. What does the work between Bamford and Jaggers Lane entail?

Jaggers Lane is the first road bridge east of Bamford Station. At one time loops existed in both directions controlled by Bamford signal box (which now lives on in Darley Dale} The Up loop is proposed for restoration - seen to the left of this Sheffield bound dmu

https://www.flickr.com/photos/elmtreephotos/8447208017/sizes/l

As with other loop restorations for mineral traffic from the Peak district (e.g. Sundon) only loaded trains need to be looped - so it is up line loops from Chinley East Junction and downside loops from Chinley West. I am not aware of any proposal to loop the Hope Valley stoppers but if traffic were to increase that would be the next logical step. Proposals for Chinley, which did include turning back and passing passenger trains are conspicuous by their absence from the Network Rail announcement.