Penmaenmawr Quarry reported to be having a new rail flow in 2017 (NORTH WALES COAST RAILWAY), any idea where it might be going.

I wondered if it might be for the new Trafford Park Metro line???
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

RichmondCommu

Established Member
Joined
23 Feb 2010
Messages
6,906
Location
Richmond, London
That's interesting because I don't think the quarry has generated any rail freight in quite some time. Indeed I'd assumed that the quarry had been completely worked out.
 

bigbadhenry

Member
Joined
4 Feb 2007
Messages
29
That's interesting because I don't think the quarry has generated any rail freight in quite some time. Indeed I'd assumed that the quarry had been completely worked out.

No it's still open. The quarry lost it contract with network rail as did not have a stone washing plant.
 
Last edited:

QueensCurve

Established Member
Joined
22 Dec 2014
Messages
2,196
Penmaenmawr Quarry reported to be having a new rail flow in 2017 (NORTH WALES COAST RAILWAY), any idea where it might be going.

It is at any rate a boost for the North Wales Coast line which [correct me if I am wrong] has no freight except for irradiated reactor fuel from Wylva - the days of which are numbered.
 

Chester1

Established Member
Joined
25 Aug 2014
Messages
4,440
It is at any rate a boost for the North Wales Coast line which [correct me if I am wrong] has no freight except for irradiated reactor fuel from Wylva - the days of which are numbered.

Hitachi is planning a new reactor at Wylfa so might generate further freight. Shame its not planning building at Almwich or Trawsfynydd instead, it could justify reopening the lines, which are unusable but still legally open.
 

anti-pacer

Established Member
Joined
5 Jun 2013
Messages
2,312
Location
Liverpool
Hitachi is planning a new reactor at Wylfa so might generate further freight. Shame its not planning building at Almwich or Trawsfynydd instead, it could justify reopening the lines, which are unusable but still legally open.

Almwich? Sounds like somewhere in Cheshire. Its Amlwch, pronounced "Am-luke". :D
 

QueensCurve

Established Member
Joined
22 Dec 2014
Messages
2,196
Hitachi is planning a new reactor at Wylfa so might generate further freight. Shame its not planning building at Almwich or Trawsfynydd instead, it could justify reopening the lines, which are unusable but still legally open.

There is an issue with Trawfynydd as the lake provides a relatively small heat sink for the reactors. Modern high power reactors are deemed unsuitable due to the consequent need for cooling towers in the national park.

Perhaps one or more small modular reactors could form a Trawfynydd B but there doesn't seem to be much appetite for this at the moment.
 

bigbadhenry

Member
Joined
4 Feb 2007
Messages
29
All nuclear fuel at the former Wylfa power plant should be off the site within two years, specialist teams have said.

And it will require nearly 500 more journeys of specially constructed nuclear flasks from Anglesey to Sellafield in Cumbria. BBC Wales
 

bigbadhenry

Member
Joined
4 Feb 2007
Messages
29
No it's still open. The quarry lost it contract with network rail as did not have a stone washing plant.

Penmaenmawr Quarry

In our recent item about possible events in the New Year we mentioned the work that was going on at Penmaenmawr Quarry sidings, and wondered whether it might presage some new rail traffic. Paul Chaplin of the Hanson company has written to tell us that the operation was to change the lights to LED bulbs - all Hanson sites are going through this change at the moment. Hanson UK have secured a five-year contract with Network Rail to supply ballast and there was a hope that Penmaenmawr would have been supplying 250,000 tons a year. However, it has been decided that the company's quarries in the Midlands will continue to supply Network Rail. There is a possibility that stone may be transported by rail from Penmaenmawr in the future; this would be going to Hanson sites in the South of England.