Currently there's been plenty of times an 807 has been swapped for a 390 on the Liverpool runs and South Parkway was skipped.
But according to this random RTT search I made for a Sunday in June 2018 (using the paid feature), back then Virgin Trains terminated at South Parkway during engineering works. They could only have used Pendos as the services interworked with Manchester/Glasgow etc.
How come they were able to stop at South Parkway back then if they can't now?
RTT links:
But according to this random RTT search I made for a Sunday in June 2018 (using the paid feature), back then Virgin Trains terminated at South Parkway during engineering works. They could only have used Pendos as the services interworked with Manchester/Glasgow etc.
How come they were able to stop at South Parkway back then if they can't now?
RTT links: