Thanks to all for some very interesting information.
In case it is not clear, the answer to your original question, assuming the Wikipedia page is correct - is the last time they were regularly diagrammed for passenger would have been March 1962, before they left the WCML. When they came to the Midland, I'm fairly sure they would not have been allocated to Cl 1 or Cl1 passenger duties, except in emergency.
(I confess that I thought they were still on the WCML in the summer of 1962, but I have long lost my spotting books from that year. )
--- old post above --- --- new post below ---
This page has a lot of Class 44 detail and covers several questions from above, including D2's high speed runs on the WCML in 1962 (presumably the LMR were too self-centred to borrow a Deltic for 100 mph trials south of Crewe).
http://www.derbysulzers.com/class44.html
These pages are indeed interesting. They are written very authoritatively, and it would appear they are in the main correct, but I do have some queries, and indeed, they raise some questions, most especially the D2 runs.
1) To answer your point about borrowing a Deltics - I would say the ER was probably too unlikely to have let one of their valuable machines go wandering off for 3-4-5 days !
2) The Wikipedia general page on the Cl 44s writes:
1961
"Further workings north of the border were converted to diesels, mostly the named Anglo-Scottish expresses, occasionally the Peaks would cover these turns, in particular D4.
Others of the Class continued to see service on the Manchester - St Pancras workings, but with the steady introduction of the more powerful D11 series Peaks, would see diminishing use of the first ten."
This is not at all in line with what I witnessed. I was a regular spotter at the southern end of the MML at that time, and I never once saw, or heard of, a Cl44 appearing, neither on passenger or freight. I know I would have remembered, because I was always on the look out for a reappearance of these locos!
Of course, I can't swear it never happened, but what I suspect may have occurred is locos based at Longsight (or other WCML sheds), may have worked passenger turns to or from Manchester to Derby (for attention)
3) What is more intriguing is the entries on D2, a fascinating account of its early years and these high speed runs.
One thing is fairly clear, at least from inference, that D2 was not passed for general running at 100 mph - it was only for the test runs (as I originally surmised).
So, D2 is fitted with a B series engine (with intercooler - this never seems to be mentioned in the Wiki text) from new, so it is 2,500 hp - but, it continues:
"The locomotive was derated to 2,300hp during July 1961 by Sulzer staff at Camden depot. Presumably at its next Works visit the 'B' series engine was exchanged for an 'A' series."
THEN - the first tests begin in August - just after the loco has been downrated!
The page continues:
"In August 1962 test trains were run on the WCML between Liverpool & Euston to evaluate the performance of the overhead line equipment and to confirm that the infrastructure of the route (track condition, signals etc) would meet the rquirements of the upcoming high speed services."
This is peculiar. Why use the downrated D2 for these tests when there were 2,500 hp locos available? Indeed, they coming off Crewe works new on a weekly basis?
And, I'm not sure where the electrification had got to at the time, but it was surely not beyond Stafford or so (it didn't reach Nuneaton until, August or Sept 1964) and the signalling at the southern end of he line was surely NOT up to 100 mph standards.
But even more peculiarly, D2 is once again chosen for high speed tests in 1964.
"D2 returned to the WCML during June 1964 when the locomotive operated out of Camden depot on further high speed test trains between Euston & Liverpool. On June 24th D2 and a seven coach test train made a round trip Euston - Liverpool with
considerable running at 100mph plus. The down trip was made in 2hrs 54min, the up trip in 2hrs 41min."
By this time, Cl 47s, which were passed for 95 mph, were around. So why use D2? There was certainly no need by then to test the loco at that speed, there was no way they were going to pass the Cl 45 for anything more than 90 mph by then, and it risked something going wrong. It seems very strange.
If anyone has the Modern Railways back issues for Sept-Oct 1964, maybe these runs are mentioned.