craigmason197!
New Member
Can i ask fellow rail fans do you think that they will ever finish this restoration and join matlock end back upto buxton so you can get on a train in matlock and get off in buxton.
4 miles in 42 years. Do the maths for completion date through to Buxton. They do, of course, have a brand new bridge, hardly used, in the centre of Buxton available for re-location if need be.From peak rail on there facebook page
NEW PARTNERSHIP TO EXAMINE VIABILITY OF RAILWAY REINSTATEMENT
In the next few weeks, in partnership with the major quarry companies operating in the Peak District and after several years of analysis, Peak Rail will be issuing a tender for bids to examine the engineering and administrative feasibility of reinstating the rail link between Peak Forest and Rowsley on the Buxton to Matlock route that was closed to through rail traffic 50 years ago on 1st July 1968. This will principally be to provide a more direct route for the expanding stone traffic between the Peak District and the Midlands and the South of England and to thereby relieve some of the busy passenger rail routes it currently follows. Since its formation in 1975 Peak Rail has reopened 4 miles of the railway from Matlock to Rowsley South for heritage operation and will be able to extend its own services further into the Peak Park to the benefit of the local tourist industry. The study would also look at any costs involved over the wider network and in continuing to cater for walking and cycling within the National Park.
END
4 miles in 42 years. Do the maths for completion date through to Buxton.
Indeed.It sounds like their study has the aim of getting the line opened by Network Rail for stone traffic, at taxpayer's expense, but then operate a heritage passenger service on the line. I would call this "pie in the sky", being my politest option. If the line I reopened for freight, it precludes heritage trains unless they all comply to Network Rail running standards?
If taxpayer's money is going in I am sure it would be only on the basis of reinstatement to Network Rail passengers standards for both franchised passenger services and freight....
I doubt they would get permission to do that unless they also made arrangements so heritage passenger and freight weren't out on the line at the same time. Conceivably, if they ran the freight only at night, they might avoid having to build a new passing loop somewhere between Matlock and Ambergate.Indeed. In fact it could be run as a Light Railway (so, 25mph etc) which would negate any need for passenger trains to use special coaching stock or permissions - unless/until it has to traverse the "real" railway at or near Buxton.
Heritage railways are allowed to use Mk1 stock which is generally banned on the main line due to crashworthiness concerns. They are also exempted from the requirement for TPWS or similar train protection system, which on its own has reduced the collision risk by about two thirds on the main line. In return for this and various other exemptions they accept the restriction to 25mph. I'm uncertain of the conditions under which NYMR runs to Whitby but they wouldn't normally share the line with anything more than the occasional Sprinter and speeds of both types of train are quite low.Why? "Light" in this context doesn't necessarily translate into weight. Surely a huge Steam Locomotive dragging 8 coaches full of happy smiling faces is hardly "light? The NYMR has had various visiting "real" trains over the years as well; recently an HST made it to Pickering for the first time. At 25mph of course.
Are you sure about that? For example the SRPS has an extensive programme of Main Line Railtours lined up for this summer using a full rake of Mark Ones. I believe that there are other operators using Mk Ones as well.Heritage railways are allowed to use Mk1 stock which is generally banned on the main line due to crashworthiness concerns.
I believe for safety reasons you have to have a mk2 on either end of a rake of mk1s if the first and last mk1 vehicle is conveying fare-paying passengers.Are you sure about that? For example the SRPS has an extensive programme of Main Line Railtours lined up for this summer using a full rake of Mark Ones. I believe that there are other operators using Mk Ones as well.
I believe for safety reasons you have to have a mk2 on either end of a rake of mk1s if the first and last mk1 vehicle is conveying fare-paying passengers.
Various charter companies now have exemptions to run full rakes of Mk1s but I believe they are still subject to special conditions. That's why I said "generally" in my previous post.Interesting theory but not how it works in practice.
For the avoidance of doubt, the track down to Loughborough is owned by the GCRN.Just to add that Great Central Railway (Nottingham) run down to Loughborough on a track that is also worked by NR for the Gypsum traffic to East Leake from the MML.
GCR(N) is worked as one train in section, all the way from Loughborough to the former Ruddington station I think, and I believe the gyspum trains only run Monday-Friday with heritage trains only at weekends. So there is no question of the two types of train encountering each other. This is the sort of model I suggested for Peak Rail in a previous post.Just to add that Great Central Railway (Nottingham) run down to Loughborough on a track that is also worked by NR for the Gypsum traffic to East Leake from the MML.
I believe for safety reasons you have to have a mk2 on either end of a rake of mk1s if the first and last mk1 vehicle is conveying fare-paying passengers.